Similar Projects
Concrete Asphalt Repair to a Fueling Station
Infrastructure, Alteration
Bidding
Sumter, SC

Check Valve Installation Project - SCPA Union Pier Terminal
Infrastructure
Bidding
Charleston, SC 29401

Gardner Boulevard Road Repair
Post-Bid
Holly Hill, SC 29059

Reconstruction/Rehabilitation - District 5
Post-Bid

Carolina Crossroads Phase 2 - Broad River Road at I-20 Interchange
Results
SC

Cart Path Asphalt Repair-Hickory Knob State Park
Results
McCormick, SC 29835

Corridor Improvements - S-47 (Spartanburg Co)
Infrastructure
Bidding
$600,000 est. value
Anderson, SC 29625

Raised Pavement Markers - District 1
Post-Bid

Intersection Improvements - S-485 and S-408
Results
SC

Enhancement - Greenville County
Infrastructure
Bidding
$600,000 est. value
Taylors, SC

Reconstruction - District 2
Post-Bid

Rehabilitation - Abbeville County
Results
SC

Lancaster County Sales Tax 17 - Subdivision
Infrastructure
Bidding
$400,000 est. value
Lancaster, SC

Paving of Two (2) Concrete Parking Pads
Post-Bid
Cross Hill, SC

Corridor Improvement - SC 118 (Hitchcock Parkway)
Results
SC

Last Updated 04/21/2022 06:43 AM
Project Title

Reconstruction/Rehabiliation

Physical Address View project details and contacts
City, State (County) SC   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Selected Clearing & Grubbing 1.000 Ls Removal & Disposal Of Existing Pavement 75.000 Sy Removal & Disposal Of Existing Asphalt Pavement 75.000 Sy Removal & Disposal Of Existing Concrete 14.000 Cy Unclassified Excavation 1,102.000 Cy Borrow Excavation 1,591.000 Cy Station Grading 52.270 Sta Cement Modified Recycled Base (10" Unif)-Curing Method b 96,108.000 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 63,796.000 Sy Portland Cement For Cement Modified Recycled Base Course 6,519.000 Ton Maintenance Stone 253.200 Ton Liquid Asphalt Binder Pg64-22 1,630.660 Ton Full Depth Asph. Pav. Patching 10"Unif 1,285.000 Sy Milling Existing Asphalt Pavement 1.75" 15,005.000 Sy Milling Existing Asphalt Pavement (Variable) 13,805.000 Sy Milled-In Rumble Strip 12.680 Mi Hot Mix Asphalt Intermediate Course Type b 9,759.786 Ton Hot Mix Asphalt Surface Course Type b 11,275.909 Ton Hot Mix Asphalt Surface Course Type c 5,594.267 Ton Driveway Paving-Surface Type c 2,079.625 Ton Asphalt Surface Treatment(Single Treatment) 159,014.000 Sy Permanent Construction Signs (Ground Mounted) 1,832.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 1,374.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 428,137.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 1,578.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 22.000 Ea White Word Message "Only"-Fast Dry Paint 12.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 2,060.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 418,424.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 775.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 1,329.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 122,423.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 120.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 723.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 8.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 6.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 2,060.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 111,346.000 Lf Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 10.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 709.000 Ea 18" Smooth Wall Pipe 296.000 Lf Adjust Catch Basin 2.000 Ea Concrete Sidewalk(4" Uniform) 18.000 Sy Detectable Warning Material 37.500 Sf Concrete Median 95.000 Sy Pedestrian Ramp Construction 75.000 Sy Rip-Rap (Class a) 90.000 Ton Geotextile Fabric For Erosion Control Under Riprap (Class 2) 90.000 Sy Remove & Dispose Semi-Rigid Gr Device 1,590.000 Lf Mt3 Leading End Treatment Tl3 8.000 Ea Mgs3cs Gr Compressed Shoulder 1,000.000 Lf Premash Type t Tl3 Leading 50' 2.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 8.560 Acre Silt Fence 2,600.000 Lf Replace/Repair Silt Fence 800.000 Lf Cleaning Silt Basins 20.000 Cy Removal Of Silt Retained By Silt Fence 800.000 Lf Aggregate No.5 Or 57 For Erosion Control 35.000 Ton

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents