Similar Projects
Cactus Middle School Site Improvements
Bidding
Casa Grande, AZ 85122

Vista Verde Drainage Project
Infrastructure
Bidding
Phoenix, AZ 85032

No Name Lake Backwater Rehabilitation Project
Post-Bid
Parker, AZ

Annual Culvert Pipe
Term Contract
Post-Bid
Safford, AZ

South Recharge Phase II
Results
Less than $8,300,000 est. value
Gilbert, AZ 85233

High Desert Middle School Concrete and Drainage Project
Results
Less than $150,000 est. value
Globe, AZ 85501

Smucker Park Detention Basin
Infrastructure
Bidding
Colorado City, Yuma, AZ 85364

Design Build Construction Services of New Drainage Systems at Housing Management Offices
Post-Bid
Window Rock, AZ

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Sedona Airport Infield RSA Drainage Improvements
Infrastructure
Bidding
Sedona, AZ 86336

Supply and Delivery of Culverts and Bands
Post-Bid
Holbrook, AZ

Professional Services - Alma School Road Improvements (Pecos To Germann) And Gilbert Road Improvements
Results
Chandler, AZ

Drainage and Sediment Control
Infrastructure
Bidding
AZ

Rover Elementary Grading and Drainage Project
Post-Bid
Tempe, AZ 85283

Williams Field Road Box Culvert Improvements, Williams Field Road and Crismon Road
Results
$700,000 to $800,000 est. value
Mesa, AZ 85211

Last Updated 12/24/2021 08:26 AM
Project Title

Wash Stabilization Improvements

Physical Address View project details and contacts
City, State (County) Lake Havasu City, AZ   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consist of wash stabilization improvements for Avalon Drain #2. The Avalon Drain #2 reach is between Avalon Avenue and Angler Drive. Wash stabilization improvements include drop structures and gabion bank protection to stabilize and protect the wash from future migration.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents