Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Oak (Flanders Mill to Ryun Sun Way) - SIF057 - City of Bozeman
Infrastructure
Conception
$500,000 CJ est. value
Bozeman, MT 59718

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

2022 North 7th Avenue Water Renovations
Infrastructure
Design
$427,000 CJ est. value
Bozeman, MT 59715

Blackfeet Reservation Apartment Complex, Browning MT
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Browning, MT 59417

Water Treatment Plant High Service Pump Station HVAC Upgrades
Renovation
Bidding
$200,000 CJ est. value
Billings, MT 59101

Gallatin County Courts Building - All Trades
Demolition, New Construction, Infrastructure - 65,000 SF
Sub-Bidding
$24,000,000 CJ est. value
Bozeman, MT 59715

Signal-12th and W Holly-Sidney
Infrastructure
Sub-Bidding
$6,000,000 CJ est. value
Sidney, MT 59270

BMP Pipe Maintenance Construction Project
Renovation, Alteration
Post-Bid
MT 59901

Montana Museum of Arts Culture Building Site Work Project
Infrastructure
Post-Bid
Missoula, MT 59812

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Water Reclamation Facility Primary Digester Cleaning and Improvements
Renovation
Results
Billings, MT

Taft Stockpile Site - Sand/Salt Cover Structure
New Construction, Infrastructure
Construction
$310,000 CJ est. value
Taft, MT 59867

Taco Bell Remodel - East Idaho Street / Kalispell
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Kalispell, MT 59901

East Gallatin Preserve Subdivision
New Construction, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Bozeman, MT 59715

Last Updated 08/08/2022 03:04 AM
Project Title

Philipsburg Wastewater Treatment System Improvements Equipment

Physical Address View project details and contacts
City, State (County) Philipsburg, MT 59858   (Granite County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $965,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the design, furnishing of equipment, and startup assistance to support the installation of wastewater treatment system upgrades. The project equipment includes: * Schedule A: New Aerated Rock Filters with Blowers New Partial-Mix Aerated Lagoon System Lagoon Aeration System with Blower(s) Lagoon Baffle System * Schedule B: New Ultraviolet Disinfection System Pre-Bid Meeting Info: None

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents