Similar Projects
Perry Drive Office and Warehouse
New Construction - 10,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Foxborough, MA 02035

Dedham Street Office
New Construction
Design
Norfolk, MA 02056

Public Works Central Avenue Offsite Storage Facility - Filed Sub-Bids
Results
Needham, MA

Scheduled and Emergency Salt Shed Repairs and Improvements at Various Locations
Results
Less than $450,000 est. value

Extra Space Storage
New Construction - 34,587 SF
Construction
$4,000,000 est. value
Weymouth, MA 02191

Route 140 Development - East Side
New Construction - 400,000 SF
Construction
$10,000,000 CJ est. value
Bellingham, MA 02019

Mechanic Street Warehouse
New Construction - 345,000 SF
Pending Verification
$10,000,000 CJ est. value
Bellingham, MA

Messina Drive Office and Warehouse
Addition - 1,843 SF
Pending Verification
$84,000 est. value
Braintree, MA

Allen Street 6 Bay Warehouse
New Construction
Design
Braintree, MA

Self Storage Facility
New Construction - 123,000 SF
Construction
Needham, MA 02192

Allen Street Commercial Building
New Construction
Pending Verification
Braintree, MA 02184

Centre Street Storage
New Construction
Design
Quincy, MA

Self-Storage Facility
New Construction - 118,848 SF
Construction
$7,000,000 est. value
Walpole, MA

Deluca & Sons Excavating & Landscaping
New Construction
Pending Verification
Norfolk, MA

Pacella Park Road Industrial Building
New Construction - 37,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Randolph, MA 02368

Last Updated 07/10/2019 12:09 PM
Project Title

Public Works Central Avenue Offsite Storage Facility - General Bids

Physical Address View project details and contacts
City, State (County) Needham, MA   (Norfolk County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required Includes construction of a new Public Works Department off-site storage building. The building is an approximate 12,600 SF single story pre-engineered metal building with an approximate 5,200 sf canopy. The project includes site work and landscaping.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents