Similar Projects
Cornerstone
New Construction
Conception
Anderson, SC 29625

Seagull Retreat RV Park
New Construction
Conception
Port Royal, SC

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

The Exchange at Old Town Depot
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Rock Hill, SC

Coral Reef Drive Drainage Improvement Project
Infrastructure
Bidding
Charleston, SC

Garden City Drainage Improvements Sites 2-7
Infrastructure
Bidding
Garden City, SC

Washout Revetment Rebuild/Repair
Post-Bid
Folly Beach, SC 29439

Playground Equipment
Post-Bid
Hilton Head Island, SC

Detention Pond Maintenance and Repair
Results
Columbia, SC

Track Field Resurfacing and Repairs
Results
SC

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

New Riverside Village - Phase 1
New Construction
Construction
Bluffton, SC

Ridge on Rolling Hills Apartments
New Construction - 329,977 SF
Design
$25,000,000 est. value
Easley, SC

Chatsworth Ditch Repair
Infrastructure
Bidding
$50,000 to $100,000 est. value
Summerville, SC

Ashley Villas Drainage Improvements Phase 3
Post-Bid
North Charleston, SC 29405

Last Updated 07/15/2021 08:32 AM
Project Title

Huntington Beach State Park Water Control Structure Repair

Physical Address View project details and contacts
City, State (County) Murrells Inlet, SC 29576   (Georgetown County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 to $55,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair of rice trunk style control gates on outflow structures from pond on the marsh side.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents