Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

Southern Service Area Lift Station - 19-PWSew-002 - Village of Huntley
Infrastructure
Conception
$2,850,000 CJ est. value
Huntley, IL 60142

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

McHenry County SportsPlex / Lakewood Community Center / Chicagoland Sportsplex
New Construction, Infrastructure - 150,000 SF
Design
$45,000,000 CJ est. value
Woodstock, IL 60098

The Racket Club 2023 Outdoor Tennis Court Rehabilitation
Infrastructure
Bidding
$180,000 CJ est. value
Algonquin, IL 60102

Construct Career, Technical and Manufacturing Center - Phase 1
LEED Certification, New Construction, Infrastructure - 52,300 SF
Bidding
$22,000,000 CJ est. value
Crystal Lake, IL 60012

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Hebron Road Pavement Improvements
Infrastructure
Post-Bid
Hebron, IL

2021 Street Improvements
Results
Less than $199,506 est. value
Marengo, IL

2021 MFT Improvement Program
Results
$1,570,414 est. value
Lake in the Hills, IL

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

Enclave Apartments and Town Homes
New Construction, Infrastructure - 7,100 SF
Pending Verification
$20,000,000 CJ est. value
Crystal Lake, IL 60014

Dole Avenue Reconstruction - City of Crystal Lake
Infrastructure
Pending Verification
$200,000 CJ est. value
Crystal Lake, IL 60014

Huntley-Dundee Sanitary Sewer Replacement - 22-PWSew-004 - Village of Huntley
Infrastructure
Conception
$275,000 CJ est. value
Huntley, IL 60142

Redevelopment of Crystal Court Shopping Center
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Crystal Lake, IL 60014

Last Updated 10/12/2022 12:06 AM
Project Title

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue

Physical Address View project details and contacts
City, State (County) Woodstock, IL 60098   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction Commenced, Request for Qualifications, Construction start expected February 2022
Bids Due View project details and contacts
Estimated Value $27,554,453 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 25, 2022, a general contractor was awarded and construction is underway. *The closed solicitation has been included below for reference: Reconstruct the intersection of Madison Street, South Street, and Lake Avenue into a roundabout in the City of Woodstock. Region 1 District 1 Federal Project # JQHB(492) County(s) McHenry Key Route(s) FAU 39 Marked Route(s) Madison Street Section(s) 16-00114-00-PV (WOODSTOCK) State Job #(s) C-91-314-16 PPS #(s) 1-22030-0000 VBP % 0.00 Completion Date: 135 Working Days Questions not accepted as of January 11, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 31, 2021. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 148 - Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue The work consists of removal of the existing pavement, curb and gutter, and sidewalks and the construction of a roundabout including excavation, topsoil, sodding, Portland cement concrete pavement, HMA pavement, sidewalk, detectable warnings, storm sewer, storm sewer structures, curb and gutter, signs and posts, thermoplastic pavement markings, underground conduits, cables, lighting controller, installation of street lights and other appurtenant construction necessary to complete the project as shown on the plans and described herein.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents