Similar Projects
Water and/or Wastewater Utility Services for FCI Aliceville
Bidding
Aliceville, AL

Church Street Utility and Drainage Improvements
Post-Bid
Fairhope, AL 36533

South Drive Utilities Improvements - Phase B
Post-Bid
Mobile, AL 36688

Nathan Estates Storm Sewer Force Main
Results
$100,000 to $150,000 est. value
Muscle Shoals, AL

2020 Pipe Assessment and Cleaning Project
Results
Tuscaloosa, AL 35401

East Street Sidewalk Project
Post-Bid
Vestavia Hills, AL 35216

Colonial Drive Enhancements
Results
Less than $2,900,000 est. value
Tuscaloosa, AL

Emergency Storm Damage Replacements at Austin Junior High School
Post-Bid
Decatur, AL 35601

Construction of the Columbus Parkway/Intellivest Stormwater Conveyance
Results
Less than $738,972 est. value
Opelika, AL 36803

Cypress Cove Street Storm Drainage Pipe Rehabilitation
Post-Bid
Eufaula, AL 36072

Rehabilitation of Gravity Sewer System - Contract 2
Results
Oak Grove, AL

2020 CDBG Stormwater Improvements
Post-Bid
Geneva, AL

2019 Sewer Improvements
Results
Haleyville, AL

Stormwater Piping for Katherine Street Improvements Contract No. 2 - Storm Materials
Post-Bid
$100,000 est. value
Cullman, AL 35056

SGA Pavilion Greenspace Storm Piping
Results
Mobile, AL

Last Updated 11/10/2020 01:08 PM
Project Title

Wilson Main Lock Culvert Valve Strut Arm Fabrication

Physical Address View project details and contacts
City, State (County) Florence, AL 35630   (Lauderdale County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK (SUBJECT TO CHANGE): The Corps of Engineers has need of a contract for The Wilson Main Lock Culvert Valve Strut Arm Fabrication consisting of the following: The culvert valve upper strut arms at the main Wilson Lock in Florence, Alabama have become severely corroded. Therefore, the contractor shall provide all necessary labor, material, and equipment to fabricate, assemble, and deliver four new upper strut arms including all necessary pins, bushings, etc. in accordance with the plans and specifications provided. Currently, the strut spindle, spindle nut, outer and inner springs, spindle bushing, and upper bushing have been fabricated and are located at the Tennessee River Operation Center (TROC). The contractor shall transport these items from TROC and bring them back to their shop to assemble the items. The contractor shall fabricate/purchase the intermediate strut end, the upper strut body, the upper strut end, intermediate bushing, intermediate strut pin, upper strut pin, intermediate grease seals, upper grease seals, collar (barrel), and intermediate bearing bushing. The contractor shall submit a detailed bill of materials for the government to approve. The contractor shall assemble the entire upper strut arm assembly as shown on the government drawings, and the contractor shall turn the spindle nut on the spindle where approximately 4” of the spindle threads show beneath the nut. This will simplify installation by project personnel. Finally, the contractor shall deliver the four assembled upper strut arms to Wilson Lock for the project personnel to install themselves. The contractor shall notify Wilson Lock two (2) weeks in advance of delivery.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents