Similar Projects
Z2dz--554-22-148 Repair Concrete Curbs, Walkways, and Ramps
Term Contract
Design
$25,000 to $100,000 est. value
Aurora, CO 80045

CDBG ADA Ramps
Infrastructure
Bidding
$800,000 est. value
Thornton, CO

Myec Zuni Parking Lot and HVAC
Post-Bid
Denver, CO 80211

Curb and Gutter Replacement
Infrastructure
Post-Bid
CO

New Park at 88th Avenue and Santa Fe Drive
Results
$1,000,000 to $1,500,000 est. value
Thornton, CO 80260

Hooker Street Pedestrian Lights at Westminster Station
Results
Westminster, CO 80003

Adams County Justice Center Secured Parking Lot Expansion Project
Infrastructure
Post-Bid
Brighton, CO 80601

2020/2021 CDBG ADA Ramps Program
Results
Brighton, CO

Parking Lot Asphalt Replacement - Pool Building
Infrastructure
Post-Bid
Brighton, CO 80601

Adams County Impound Lot Expansion
Results
Brighton, CO

East 58th Avenue Improvements
Infrastructure
Post-Bid
CO

Rocky Mountain Elementary Sidewalk Project
Results
Less than $506,985 est. value
Westminster, CO 80031

2022 Concrete Trails Program
Infrastructure
Post-Bid
Northglenn, CO

2021 Concrete Trails Program
Infrastructure
Results
Northglenn, CO

2022 Transportation Preservation and Improvements
Infrastructure
Post-Bid
Brighton, CO

Reported 05/17/2022 12:00 AM
Project Title

Kiowa Bennett Concrete Trail Extension

Physical Address View project details and contacts
City, State (County) Bennett, CO 80102   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Developer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to remove the existing asphalt trail from 6th Avenue (2,538.42 L.F). to the south and tie back into the temporary asphalt trail to allow for the new set back location of a permanent 8' concrete trail along Kiowa Bennett. This trail comes from the Bennett Regional Park and Open Space through the Town of Antelope Hills Subdivision, then North onto Kiowa Bennett Road. Currently the trail is a temporary asphalt and dead ends at 6th. The trail will be set back in Town of Bennett ROW and this will be the new permanent location for the 2,538.42 LF of new concrete trail per plans. To provide selective site demolition, excavating, grading, subgrade preparation, concrete paving, backfill and fine grading, reseeding and all related construction work and services as required thorough the construction process for the Kiowa Trail.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents