Similar Projects
Community Center Expansion - Hastings Parks and Recreation
Addition, Demolition, Infrastructure
Conception
$2,800,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

WashTech Car Wash / Hastings
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Hastings, NE 68901

NEARNG - Greenlief Training Site(GTS) Barrack 665 Construction Project
New Construction, Infrastructure - 3,800 SF
Bidding
$300,000 CJ est. value
Hastings, NE 68901

NEARNG - Greenlief Training Site(GTS) Barrack 665 Construction Project
New Construction, Infrastructure - 3,800 SF
Bidding
$300,000 CJ est. value
Hastings, NE 68901

GTS Transient Training Officers Quarters Construction (640)
New Construction, Infrastructure - 6,550 SF
Post-Bid
$2,000,000 CJ est. value
Hastings, NE 68901

GTS Transient Training Officers Quarters Construction (640)
New Construction, Infrastructure - 6,550 SF
Post-Bid
$2,000,000 CJ est. value
Hastings, NE 68901

2023 Concrete Paving Hayland Avenue & 82nd Street
Infrastructure
Results
$2,122,307 CJ est. value
Verona, NE 68955

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

Kansas Avenue Medical Clinic Building
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade Main on Marian Road from 7th Street to 9th Street - City of Hastings
Infrastructure
Conception
$350,000 CJ est. value
Hastings, NE 68901

NEARNG - GTS Transient Training Battalion HQ Building 709 Construction Project
New Construction, Infrastructure - 3,559 SF
Bidding
$997,000 CJ est. value
Hastings, NE 68901

Lochland Country Club Poolhouse
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Hastings, NE 68901

7th Street - Chestnut Avenue to Oswego Avenue - City of Hastings
Infrastructure
Conception
$390,000 CJ est. value
Hastings, NE 68901

GTS Officers Quarters Building 635
New Construction, Infrastructure
Post-Bid
$366,800 CJ est. value
Hastings, NE 68901

Last Updated 07/24/2023 04:17 PM
Project Title

NEARNG - GTS Headquarters Building Addition and Remodel Project

Physical Address View project details and contacts
City, State (County) Hastings, NE 68901   (Adams County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,020,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of furnishing all design services labor, equipment, tools, materials, travel, lifts, licenses & permits required to construct a 2,100 SF addition onto the Training Site Headquarters Building (Bldg. 12) at the Greenlief Training Site, Hastings, NE. The original 2,800 SF building was constructed in 2006. This building addition will primarily construct additional offices, admin and conference room space. A portion of the existing building (approx 1,200 SF) will be remodeled and reconfigured in conjunction with the building addition. Questions about obtaining bid documents should be directed to A&D Technical Supply at 402-474-5454 or planroom@ad4lincoln.com Questions or issues about the contents of the project should be directed to Mr. Keith Brocksmith (402) 309-8473

Details

,, 6,100 SF - 2,100 SF. 2,800 SF. 1,200 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents