Similar Projects
Kingdom Hall of Jehovah's Witnesses
New Construction, Infrastructure - 3,000 SF
Conception
$1,000,000 CJ est. value
Aurora, OH 44202

Cleveland Avenue (SR 532) Trunk Sewer - Construction - Summit County
Infrastructure
Conception
$1,700,000 CJ est. value
Mogadore, OH 44260

Roadway Minor Rehab - SR 43
Infrastructure
Design
$1,434,000 CJ est. value
Kent, OH 44240

Roadway Minor Rehab - SR 82
Infrastructure
Design
$1,784,000 CJ est. value
Aurora, OH 44202

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

RFQ Design - Future City Hall
New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Streetsboro, OH 44241

Asphalt Paving - Contract 2022-E
Infrastructure
Results
$689,970 CJ est. value
Ravenna, OH 44266

2022 Hankee Road Culvert Replacement
Infrastructure
Results
$421,595 CJ est. value
Garrettsville, OH 44231

College of Business Administration Building - Kent State University
New Construction, Infrastructure - 147,000 SF
Construction
$72,900,000 CJ est. value
Kent, OH 44240

RFQ Design - Future Community Center Building
New Construction, Infrastructure
Construction
$3,100,000 CJ est. value
Streetsboro, OH 44241

The Kensington at Anna Maria Addition
Addition, Infrastructure - 2,200 SF
Pending Verification
$600,000 CJ est. value
Aurora, OH 44202

Greens of Aurora - Phase I
New Construction, Infrastructure - 17,700 SF
Pending Verification
$5,000,000 CJ est. value
Aurora, OH 44202

Roadway Minor Rehab - SR-88
Infrastructure
Conception
$730,000 CJ est. value
Garrettsville, OH 44231

Renaissance Park at Geauga Lake - Phase 2 East
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Aurora, OH 44202

Abandoned Gas Station Cleanup Project
Infrastructure
Post-Bid
$280,000 est. value
Windham, OH 44288

Last Updated 10/07/2023 07:32 AM
Project Title

Bolingbrook WWTP Sludge Tank Replacement

Physical Address View project details and contacts
City, State (County) Streetsboro, OH 44241   (Portage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $189,683 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all labor, material, and necessary to construct two pre-cast sludge holding tanks approximately 12 feet in width, 18 feet in length, and 7 feet in height. Tanks are to include six (6) diffuser assemblies connected to an existing airline, internal decant and load out piping, a 4-inch Polyvinyl Chloride SDR35 influent piping with appropriate valving to both tanks, an overflow line for each tank with appropriate valving to isolate each tank, piping to connect the scum airlift to the headworks, an aluminum handrail at a minimum height of 3 feet 6 inches above grade, and an 18-inch square cast in place concrete ballast around the perimeter of the tanks for anti-floatation. The Bid Guarantee is conditioned to provide that if the Bid is accepted and awarded, the Bidder will enter into a contract with the County and will file a Performance Bond as required. The Bidder to whom the Contract is awarded will be required to furnish a Performance Bond in the sum of 100 percent of the Contract price for the faithful performance of the Contract. If the Bidder selects "Bid Guarantee" Option A, the Bidder may use this Bond as the Performance Bond. All questions shall be directed to the Portage County Water Resources Department in writing to Joe Andrassy at jandrassy@portageco.com. The Owner intends and requires that the project be completed no later than one hundred and eighty (180) calendar days after the "Notice to Proceed" is issued and complete restoration within thirty (30) calendar days Any questions to Portage County Water Resources staff prior to, during, and following the pre-bid meeting must be documented in an email to jandrassy@portageco.com. Any questions should be referred to Portage County Water Resources in writing to jandrassy@portageco.com at least 5 business days prior to the date on which bids will be taken. The Portage County Commissioners reserve the right to waive any informality or to reject any and all bids

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents