Similar Projects
Installation of Playground Equipment in Three County Parks
Addition
Bidding
Doylestown, PA

Purchase and Installation of Poured in Place Rubber Surfacing
Addition
Post-Bid
Less than $21,300 est. value
Langhorne, PA 19047

Harry S Truman High School Softball Field Improvements
Infrastructure
Post-Bid
Levittown, PA 19057

Memorial Park Expansion Phase 2
Results
Yardley, PA 19067

Council Rock High School South Synthetic Turf Field/Tennis & Basketball Court
Results
Holland, PA 18966

Harry S Truman High School Running Track Replacement
Renovation
Post-Bid
Levittown, PA 19057

Aquetong Spring Park Improvements - Contract 2
Results
New Hope, PA 18938

Poured in Place Rubber Playground Surface
Infrastructure
Post-Bid
Jamison, PA

Jfk Park Revitalization
Renovation
Results
Bristol, PA

Community Park Hockey Rink Improvement
Results
Fairless Hills, PA

Stadium Track Renovations and Synthetic Turf Improvements
Results
New Hope, PA 18938

Purchase and Installation of a Composite Structure for Playwicki Park
Results
Langhorne, PA 19047

Broad Street Gateway Park Plaza
Renovation
Results
Doylestown, PA 18901

Pennridge High School Tennis Courts
Results
$1,000,000 to $1,250,000 est. value
Perkasie, PA 18944

2021 Playground Renovation Project: Barclay Elementary School and Cold Spring Elementary School
Renovation
Results
Doylestown, Warrington, PA 18976

Last Updated 03/17/2022 06:02 AM
Project Title

2022 Playground Renovation

Physical Address View project details and contacts
City, State (County) Buckingham, Doylestown, PA 18902   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of the following: Installation of erosion and sedimentation control measures. Removal and disposal of existing wood fiber mulch, Selective demolition of site related items, Site grading to establish design subgrade elevations, Construction of concrete curb and/or concrete paving, Construction of drainage features. Installation of stone drainage layer, Relocation of some existing playground equipment, Receiving new playground equipment pre-purchased by Owner. Installation of new playground equipment, Installation of pour-in-place rubber safety surface and conducting impact testing. Installation of compacted engineered wood fiber, Restoration of asphalt paving. Clean work area and remove any construction debris. Stabilize all disturbed areas and remove E&S measures.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents