Similar Projects
Ringling College of Art & Design - Dining Facility
New Construction - 30,000 SF
Conception
$11,000,000 est. value
Sarasota, FL 34234

Powell University House
New Construction
Conception
$11,800,000 est. value
Gainesville, FL

CasaCuba Culture Center
New Construction - 58,000 SF
Design
$23,000,000 est. value
Miami, FL 33199

Harn Museum American Art Wing
Addition - 20,000 SF
Design
$12,700,000 est. value
Gainesville, FL 32608

Continuing Services Contract to Provide Construction Management (CM) Services
Term Contract
Post-Bid
Sarasota, FL 34243

Building 2000 Hvac Equipment Replacement
Post-Bid
Kendall, FL 33176

Pre-Qualified Contractors - New Certificates
Renovation, Addition
Results
Orange Park, Palatka, Saint Augustine, FL

Pre-Qualified Contractors - New Certificates
Renovation, Addition
Results
Orange Park, Palatka, Saint Augustine, FL

USFSP Davis Hall Renovation
Renovation
Construction
$3,050,000 est. value
Saint Petersburg, FL

FAMU New Student Services Dining Facility
- 14,362 SF
Construction
$10,869,230 est. value
Tallahassee, FL

Engineering Building
New Construction
Post-Bid
$60,000,000 est. value

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Results
Lakeland, FL 33868

Saint Leo New Wellness Center
New Construction - 59,000 SF
Construction
$20,000,000 est. value
Saint Leo, FL 33574

CCET Building Renovations
Renovation
Post-Bid
Tampa, FL 33600

Eduardo J. Padron 11th, 12th, 14th, and 15th Floors Renovation Project
Renovation
Construction
Miami, FL 33135

Last Updated 11/03/2021 12:22 PM
Project Title

Building 56 - Diesel Mechanics Addition

Physical Address View project details and contacts
City, State (County) Lake City, FL   (Columbia County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to: cutting and patching, selective structure demolition, metal fabrications, vapor retarders, joint protection, door schedule, hollow metal doors and frames, rolling service doors, aluminum framed entrances and storefronts, door hardware, glazing, finish schedule, painting and coating, specialties, signage, metal building systems and termite control. Structural, Mechanical, Plumbing and Electrical as outlined in the documents.

Details

College/University, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents