Similar Projects
Last Updated | 05/08/2021 02:34 AM |
Project Title | Resurfacing on US 31w (SR. 41) |
Physical Address | View project details and contacts |
City, State (County) | TN (Sumner County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project No. NH-41(27), 83008-8232-14 (PIN 129475.00) The resurfacing on U.S. 31W (S.R. 41) from near Jarrett Road (L.M. 5.00) to S.R. 25 (L.M. 14.41). Project Length - 9.410 miles Completion Time - On or before 10/31/2021 (See Special Provision 108B) The DBE goal for this contract is 6.5%. 208-01.05 Brooming & Degrassing Shoulders 18.800 L.m. 303-01 Mineral Aggregate, Type a Base, Grading D 6,491.000 Ton 307-01.15 Asc Mix (Pg64-22) (Bpmlc-hm) Grading Cs 500.000 Ton 307-02.08 Asphalt Concrete Mix (Pg70-22) (Bpmb-hm) Grading B-m2 1,500.000 Ton 403-01 Bituminous Material for Tack Coat (Tc) 105.000 Ton 411-02.10 Acs Mix(Pg70-22) Grading D 16,268.000 Ton 411-12.02 Scoring Shoulders (Non-continuous) (16inwidth)12.300 L.m. 411-12.03 Scoring for Rumble Stripe (Noncontinuous) (8in Width)4.300 L.m. 415-01.01 Cold Planing Bituminous Pavement 16,114.000 Ton 611-09.01 Adjustment of Existing Catchbasin 37.000 Each 701-02.01 Concrete Curb Ramp (Retrofit) 130.000 S.f. 705-02.10 Guardrail Transition 27in to 31in 1.000 Each 705-04.09 Earth Pad for Type 38 Gr End Treatment 1.000 Each 705-06.20 Tangent Energy Absorbing Term Mash Tl-3 1.000 Each 706-01 Guardrail Removed 75.000 L.f. 712-01 Traffic Control (1) Ls 712-04.01 Flexible Drums (Channelizing) 50.000 Each 712-06 Signs (Construction) 2,521.000 S.f 712-08.03 Arrow Board (Type C) 2.000 Each 713-11.02 Perforated/knockout Square Tube Post 1,220.000 Lb. 713-13.02 Flat Sheet Aluminum Signs (0.080" Thick) 159.000 S.f. 713-15 Removal of Signs, Posts and Footings (1) Ls 713-20.30 Sign Adjustments 5.000 Each 716-01.21 Snowplowable Raised Pavement Markers (Bi-dir) (1 Color) 621.000 Each 716-01.30 Removal of Snowplowable Reflective Marker 621.000 Each 716-02.04 Plastic Pavement Marking(Channelization Striping) 159.000 S.y. 716-02.05 Plastic Pavement Marking (Stop Line) 275.000 L.f. 716-02.06 Plastic Pavement Marking (Turn Lane Arrow) 33.000 Each 716-02.08 Plastic Pavement Marking (8" Dotted Line) 510.000 L.f. 716-02.09 Plastic Pavement Marking (Longitudinal Cross-walk) 469.000 L.f. 716-03.03 Plastic Word Pavement Marking (Stop Ahead) 1.000 Each 716-03.06 Plastic Word Pavement Marking (Signal Ahead) 2.000 Each 716-04.04 Plastic Pavement Marking (Transverse Shoulder) 4,462.000 L.f. 716-04.05 Plastic Pavement Marking (Straight Arrow) 4.000 Each 716-04.13 Plastic Pavement Marking (Bikelane Symbol & Arrow) 124.000 Each 716-04.15 Plastic Pavement Marking-bike Symbol/arrow Shared 17.000 Each 716-04.18 Plastic Pavement Marking (Bike/xing) 2.000 Each 716-05.20 Painted Pavement Marking (6" Line) 69.300 L.m. 716-12.02 Enhanced Flatline Thermo Pvmt Mrkng (6in Line) 69.300 L.m. 716-12.05 Enhanced Flatline Thermo Pvmt Mrkng (6in Dotted Line) 5,060.000 L.f. 717-01 Mobilization (1) Ls 730-14.02 Saw Slot 3,943.000 L.f. 730-14.03 Loop Wire 8,986.000 L.f. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |