Similar Projects
South Main Corridor Improvement
Infrastructure
Bidding
Maryville, MO

Road Construction
Infrastructure
Bidding
Ferguson, MO

Intersection Improvements
Post-Bid
Gladstone, MO 64119

Highway 210 and Walker Road Intersection Improvements
Post-Bid
North Kansas City, MO

Sunridge Park Asphalt and Sealing Project 2021
Results
Hillsboro, MO 63050

2021 Mill, Mat and Asphalt Overlay Program
Results
Festus, MO

Heman Park Service Road Improvements
Infrastructure
Bidding
University City, MO

2021 Mill and Overlay Program
Post-Bid
Gladstone, MO

Route 9 Improvements
Results
Parkville, MO 64152

Aquatic Center Parking Lot Asphalt and Curb Maintenance
Infrastructure, Alteration
Bidding
Willard, MO 65781

2021 Intermediate Maintenance Program
Post-Bid
Gladstone, MO

163rd Street Improvements
Results
Pleasant Hill, MO 64080

North Stark Avenue Road Improvements
Infrastructure
Bidding
Kansas City, MO

Roadwork
Post-Bid
Kirksville, MO

FY22-FY26 On-Call Paving
Term Contract
Results
Olivette, MO

Last Updated 08/05/2021 04:12 PM
Project Title

Red Bridge Road Complete Street - Holmes Road to Wornall Road

Physical Address View project details and contacts
City, State (County) Kansas City, MO   (Clay County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct and widen Red Bridge Road from Holmes Road to about 900’ west of Wornall Road. The construction will generally include reconstructing the westbound lanes and constructing a new median and eastbound lanes from Wornall Road to Oak Street and reconstructing the divided street between Oak Street and Holmes Road. A sidewalk is included on the north side of the road and a 10 foot wide multi-use path in to be constructed on the south side of Red Bridge Road. Minor street widening will occur on Wornall Road to the south and Red Bridge Road to the west of the intersection. Traffic signals will be replaced at Holmes Road and Wornall Road. Construction work elements will include: mobilization, removal of existing pavement and improvements, clearing and grubbing, grading, asphaltic concrete paving, aggregate base, concrete sidewalk and driveways, concrete multi-use path, concrete curb & gutter, storm drainage improvements including pipes, inlets and manholes, traffic signals, street lighting, water main relocation, pavement marking and permanent signing, landscaping, erosion control, traffic control, and appurtenant construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents