Similar Projects
Chiller Bldg 698
Infrastructure
Bidding
Patrick AFB, FL 32925

Countywide HVAC Preventative Maintenance and Minor Repair Services
Term Contract, Alteration
Bidding
FL

Brevard Public Schools Locker Room HVAC Projects
Post-Bid
Melbourne, FL 32901

HVAC and Mechanical Products
Term Contract
Post-Bid

Repair HVAC System, Bldg 3656, PAFB
Results
Patrick AFB, FL 32925

Rooftop Unit (RTU) Replacement
Results

Logistics Facility Heating, Ventilation and Air Conditioning (HVAC) Replacement
Post-Bid
$1,000,000 to $5,000,000 est. value
FL 32899

Housing and Human Services Residential Rehabilitation
Results
Viera, FL

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Air Conditioning Unit Replacement - D.B. Lee Water Reclamation Facility
Alteration
Results
Melbourne, FL 32935

Brevard (Viera) CHD - Chiller Replacement
Post-Bid
Viera, FL

HVAC Water Treatment Services and Supplies
Alteration
Results
Viera, FL

Logistics Facility Heating, Ventilation and Air Conditioning (HVAC) Replacement, Kennedy Space Center, Fl.
Post-Bid
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL

Brevard County Detention Center Kitchen HVAC Replacement
Alteration
Results
Cocoa, FL 32926

Hoods and Duct Cleaning Maintenance and Repair PASFB
Term Contract
Post-Bid
Patrick AFB, FL

Reported 03/22/2022 02:37 PM
Project Title

DBEH 21-1535 Install Rotary Fan

Physical Address View project details and contacts
City, State (County) Cape Canaveral, FL 32925   (Brevard County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Brief description of work: Project DBEH 21-1535; The work to be performed consists of installing a rotary fan press skid under the pavilion next to the current drying beds. Connect the rotary press skid overhead water header to the existing potable water supply that routes to the polymer mixing room in the pavilion. Install one (1) conveyor abutting the proposed rotary fan press sludge dewatering system to transfer the dewatered product to a roll-off type dumpster inside the pavilion. Route overhead water header above rotary press skid and provide individual drops of stainless-steel flex pipe to each wash water connection

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents