Similar Projects
Last Updated | 08/14/2021 03:08 AM |
Project Title | Engineering Design Services For Carley And Peter Springs Well Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Santa Rosa, CA (Sonoma County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | New Carley groundwater well (boring, casing, sanitary seal, wellhead, etc) New well pump and motor with variable frequency drive (VFD) New electrical, including service from PG&E meter to well building New site piping and valves to provide separate conveyance for well water to potable use and irrigation use New water meters for each well New telemetry and controls to serve both wells New chlorination system to serve both wells New backup diesel generator to serve both wells New building to house Carley wellhead, electrical, controls, telemetry equipment, and ancillary plumbing New pressure vessel, if needed New fence around the property New driveway from Idaho Drive Abandon existing Carley Well Remove all redwood trees on site (approximately 9) Extend the Peter Springs well above grade and install a protective enclosure Take account of and appropriately address site geotechnical concerns (displacement) |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |