Similar Projects
C--A&E IDIQ VA in AZ/CA/NM
Bidding
$3,000 to $1,000,000 est. value

C--A&E IDIQ VA in AZ/CA/NM
Bidding
$3,000 to $1,000,000 est. value

IDC A-E Services for Horizontal Design Needs Primarily for Department of Homeland Security Nationwide
New Construction, Renovation
Results
Less than $65,000,000 est. value

IDC A-E Services for Horizontal Design Needs Primarily for Department of Homeland Security Nationwide
New Construction, Renovation
Results
Less than $65,000,000 est. value

Castle Water System Management
Infrastructure
Bidding
Merced, CA

Indefinite Delivery/Indefinite Quantity Contract for Architect-Engineer Services for Geotechnical Engineering Services at Various Government Installations Primarily In The NAVFAC-South
Term Contract
Bidding
$2,000 to $15,000,000 est. value

Diablo Creek Maintenance Building Fire Repair
Alteration
Bidding
Concord, CA 94520

General Housing Development Consultant
New Construction, Infrastructure
Bidding
San Jose, CA 95113

Engineering Design Services For Treatment Plan And Operational Service Center Code Compliance Improvement
Alteration
Bidding
Long Beach, CA 90899

Last Updated 08/14/2021 03:08 AM
Project Title

Engineering Design Services For Carley And Peter Springs Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Santa Rosa, CA   (Sonoma County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Carley groundwater well (boring, casing, sanitary seal, wellhead, etc) New well pump and motor with variable frequency drive (VFD) New electrical, including service from PG&E meter to well building New site piping and valves to provide separate conveyance for well water to potable use and irrigation use New water meters for each well New telemetry and controls to serve both wells New chlorination system to serve both wells New backup diesel generator to serve both wells New building to house Carley wellhead, electrical, controls, telemetry equipment, and ancillary plumbing New pressure vessel, if needed New fence around the property New driveway from Idaho Drive Abandon existing Carley Well Remove all redwood trees on site (approximately 9) Extend the Peter Springs well above grade and install a protective enclosure Take account of and appropriately address site geotechnical concerns (displacement)

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents