Similar Projects
Solon Springs - Superior
Infrastructure
Conception
$500,000 CJ est. value
Poplar, WI 54864

Solon Springs - Superior
Infrastructure
Conception
$500,000 CJ est. value
Poplar, WI 54864

UW Superior - ESPC - 1 MW Solar Array - University of Wisconsin System - Administration
Infrastructure
Design
$1,651,000 est. value
Superior, WI

Nebagamon Creek Railroad Grade Removal
Infrastructure
Bidding
$600,000 CJ est. value
Lake Nebagamon, WI 54849

Culvert Replacement on Balsom Bend Road
Infrastructure
Bidding
$2,075,973 CJ est. value
Maple, WI 54854

Poly Fiber Flex Patch
Infrastructure
Post-Bid
Gordon, Minong, WI 54859

Scrub Seal with Fog Seal over Asphalt Road
Infrastructure
Post-Bid
Gordon, Minong, WI 54838

Brule - Ino, Sznaider Road to CTH A; Wentworth - Ino, Clevedon Road to Sznaider Road;
Infrastructure
Results
$100,000 est. value

Brule - Ino, Sznaider Road to CTH A; Wentworth - Ino, Clevedon Road to Sznaider Road;
Infrastructure
Results
$100,000 est. value

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Pickle Pond TSS Removal
Infrastructure
Bidding
$500,000 CJ est. value
Superior, WI 54880

2022-23 Blacktop Resurfacing - Hot Mix Bond Leader Lake Road to Leader Lake Road
Infrastructure
Post-Bid
Minong, WI 54859

Barker's Island SOGL Site Improvements Project
Infrastructure
Results
$1,342,025 CJ est. value
Superior, WI 54880

Blacktop Surfacing - Warm Mix Asphalt - 2022
Infrastructure
Post-Bid
Minong, WI 54859

Last Updated 06/19/2023 02:05 PM
Project Title

21st Avenue East Sanitary Sewer Branch Partial Replacement

Physical Address View project details and contacts
City, State (County) Superior, WI 54880   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $55,736 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this contract shall include removing 128-feet of 15 to 18-inch Vitrified Clay Pipe (VCP), removing existing brick structure, installing 128-feet of 15-inch PVC pipe, installing 48-inch concrete structure, re-connecting existing sewer services, reconstructing the bituminous alley/church parking lot. Bid Bond 5% Plan (blueprint) Electronic plan documents eBidding No Deadline for questions is Monday, January 23 rd , 2023, at 12:00 pm. All questions should be emailed to the City of Superior ESD at: gundersonb@ci.superior.wi.us. The final addendum(s) will be issued Tuesday, January 24th , 2023, at 4:00pm

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents