Similar Projects
FOSC - Move Heat Pump Unit
Term Contract
Design
$25,000 to $100,000 est. value
Fort Scott, KS 66701

Lenexa Readiness Center Geothermal Ground Source Heat Pump HVAC Replacement
Alteration
Bidding
Less than $1,000,000 est. value
Lenexa, KS

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Roberts Building HVAC Replacement
Results
$439,994 est. value
Olathe, KS 66061

Chem-BioChem Building Fume Hood Upgrades- Phase 1
Results
$1,380,000 est. value
Manhattan, KS

Headworks Make-Up Air Unit Replacement HVAC Improvements
Post-Bid
McPherson, KS

Replacement of Vav Boxes in Administration Building Phase II
Alteration
Results
Less than $128,000 est. value
KS

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Juvenile Residential Facility - HVAC Replacement
Term Contract
Results
Wichita, KS 67211

Preventative Service Maintenance and Inspection of Commercial Chillers, Boilers and Pumps
Term Contract, Alteration
Post-Bid
Wichita, KS

Replace HVAC Units at the Meadowlark and Sunflower Heights Complexes
Alteration
Results
Halstead, KS

Replacement of HVAC Equipment at the East Lawrence Recreations Center, Kaw River Waste Water Treatment Plant and Fire Medical Station 2
Alteration
Post-Bid
Lawrence, KS

Fire Station #2 HVAC System Improvements
Alteration
Results
Emporia, KS 66801

Ottawa HS Chiller Replacement
Alteration
Post-Bid
Ottawa, KS 66067

Reported 09/22/2021 12:00 AM
Project Title

Replacement of Gas Fired Radiant Heaters at the Lawrence Airport

Physical Address View project details and contacts
City, State (County) Lawrence, KS 66044   (Douglas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes all removal replacement and disposal the current gas fired radiant heaters, all gas piping, electrical wiring, thermos stats and upgrades to CO devices, exhaust fans, louvers grills and any other component

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents