Similar Projects
Mixed Use Apartments
New Construction - 15,520 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Las Vegas, NV 89183

West Henderson Parks And Recreation, Phases 2 - 5 - PR247 - City Of Henderson
New Construction, Infrastructure
Conception
$84,000,000 CJ est. value
Henderson, NV 89015

Tropicana Grand Canyon Apartments
New Construction - 682 SF
Design
Las Vegas, NV 89147

Ashley Furniture Industrial Facility
New Construction, Infrastructure - 298,389 SF
Design
$32,000,000 CJ est. value
Las Vegas, NV 89148

RFQ Engineering - Boulder City Municipal Golf Course Irrigation Replacement and Turf Reduction
Infrastructure
Bidding
$500,000 CJ est. value
Boulder City, NV 89005

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

AutoZone #6871 / Henderson
New Construction, Infrastructure - 7,380 SF
Post-Bid
$1,500,000 CJ est. value
Henderson, NV 89015

Silverado Ranch Boulevard - Jones Boulevard To Arville Street - Phase A
Results
$7,851,626 to $8,678,112 est. value
NV

Sierra Vista Improvements
Infrastructure
Results
$3,151,446 to $3,483,178 est. value
Las Vegas, NV

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Touro University Parking Expansion Phase II
New Construction
Construction
Henderson, NV 89014

Boulder Lodge Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$9,600,000 CJ est. value
Henderson, NV 89015

Dream Hotel Las Vegas
New Construction, Infrastructure - 27,000 SF
Pending Verification
$545,000,000 CJ est. value
Las Vegas, NV 89119

Burkholder Blvd - Warm Springs To Russell, Phase 2 - ST093 - City Of Henderson
Infrastructure
Conception
$6,600,000 CJ est. value
Henderson, NV 89015

Aspire at Sunset
New Construction, Infrastructure
Design
$75,000,000 CJ est. value
Henderson, NV 89014

Last Updated 12/06/2022 03:38 AM
Project Title

Hoover Dam Parking Lots Rehab

Physical Address View project details and contacts
City, State (County) Boulder City, NV 89005   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,429,720 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Nov 14, 2022 Contract Award Number: 6982AF23C000003 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: C & C CONTRACTING INC Contractor Awarded Address: Montclair, NJ 07042-5009 USA Base and All Options Value (Total Contract Value): $1429720.00 PROJECT NO. AZ/NV BR LCDO HOOVER PARKING Project Details: AZ/NV BR LCDO Hoover Dam Parking - Hoover Dam Parking Lots Rehab PROJECT DESCRIPTION: This project proposes to accomplish pavement preservation for parking lots in the vicinity to the Hoover Dam. The project begins at the Clark County/Bureau of Reclamation boundary, approximately 750 feet west of the security checkpoint on the Nevada side and continues across the Hoover Dam, ending at the turnaround parking lot on the Arizona side. Timely completion of construction will be crucial to minimize parking lot closures and impact on visitors and traffic. SCOPE OF THE WORK: The project proposes to accomplish pavement preservation for 17 parking lots along the Hoover Dam Access Road. The pavement preservation would include full depth patching, crack sealing, surface treatment, permanent pavement markings and permanent signing. The project also includes a slope failure repair on the mainline and rock lining under recently installed guardrail for erosion protection. PRINCIPAL WORK ITEMS: Estimated quantities of principal work items include: 48,500 square yards of fog seal 4.2 miles of cleaning and sealing of cracks 250 square yards of asphalt concrete pavement patch 425 cubic yards of placed riprap 13.5 miles of pavement markings 105 pavement marking symbols 65 sign systems PROJECT MAGNITUDE: Between $700,000 and $2,000,000 Site visits may be arranged during normal duty hours by contacting: No organized site visit will be held. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 2 P.M. ON SEPTEMBER 20, 2022. Questions can be submitted to CFLContracts@dot.gov. The amount of the bid guarantee shall be twenty (20%) percent of the bid price or $3,000,000.00, whichever is less. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents