Similar Projects
Clow Science Center & Nursing Education Building - Phase II GPC
Renovation - 80,000 SF
Bidding
$17,012,000 est. value
Oshkosh, WI 54901

Clow Science Center & Nursing Education Building - Phase II GPC
Renovation - 80,000 SF
Bidding
$17,012,000 est. value
Oshkosh, WI 54901

Oshkosh Campus Monument Signs
Post-Bid
Oshkosh, WI

Custodial Offices Relocation
Results
$160,000 est. value
Oshkosh, WI 54901

Fox Valley Tech Student Life and Diversity - Oshkosh
New Construction
Results
Oshkosh, WI 54902

Multi Building - Phase II AAC
Renovation - 80,000 SF
Bidding
$17,012,000 est. value
Oshkosh, WI 54901

Multi-Building Elevator Renovation - General
Renovation
Results
Less than $2,330,400 est. value
Oshkosh, WI 54901

FVTC Oshkosh Riverside - Science Labs and Nursing and Medical Assistant Labs Remodels
Renovation
Bidding
Oshkosh, WI 54902

Multi-Building Elevator Renovation - MEP
Renovation
Results
Less than $2,330,400 est. value
Oshkosh, WI 54901

Music Practice Rooms and Anthropology Lab Renovations -MEP
Renovation
Results
$2,200,000 est. value
Oshkosh, WI 54901

Music Practice Rooms and Anthropology Lab Renovations-General
Renovation
Results
$2,200,000 est. value
Oshkosh, WI 54901

UWO Fox Cities Child Care Center Building
Addition
Results
Menasha, Winnebago, WI 54952

Last Updated 01/20/2022 05:48 AM
Project Title

Multi Building - Phase II MEP

Physical Address View project details and contacts
City, State (County) Oshkosh, WI 54901   (Winnebago County)
Category(s) Commercial, Education, Laboratory
Sub-Category(s) College/University, Laboratory, Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $17,012,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the renovation of the Nursing Education Building which was built in 1966 and includes classrooms, lecture halls, faculty, staff and administrative offices, counseling and lab spaces. The building is attached to Clow Hall which was remodeled in 2015. The Nursing Education Building includes a basement and six stories. Work includes demolition and reconstruction of the majority of interior walls, and mechanical, electrical, and fire protection systems, including fire alarm and security systems, phone/data, and AV systems. In total the project includes approximately 80,000 sq. ft. of renovated space

Details

Office, Renovation, College/University, Approximately 80,000 SF Renovation, Laboratory, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents