Similar Projects
Install Shade Structures for Hazmat Containers and Chiller Control Panels
Bidding
$25,000 to $100,000 est. value
Maricopa, AZ 85138

Install Shade Structures for Hazmat Containers and Chiller Control Panels
Bidding
$25,000 to $100,000 est. value
Maricopa, AZ 85138

Exterior Repairs of Public Rental Units
Post-Bid
Chinle, AZ 86504

General Contractor for the Weatherization Project at Curiel Primary School
Post-Bid
Eloy, AZ 85131

Z--Apply Clear Top Coat to Exterior Log Cabin Walls
Results
Littlefield, AZ 86432

Z--LAKE19-1375-Repair the Foundation at KL Qrtrs 105
Results
$25,000 to $100,000 est. value
Bullhead City, AZ 86429

Amplify - Phase II
Renovation - 65,022 SF
Pending Verification
$415,000 est. value
Chandler, AZ 85226

Install Shade Structures For Research Equipment
Bidding
Maricopa, AZ 85239

Eloy Main Street Renovation Project
Post-Bid
Eloy, AZ 85231

Weatherization Project at Desert Vista High School
Results
Phoenix, AZ 85048

Install Shade Structures Over Gov Parking Lot
Bidding
$25,000 to $100,000 est. value
Maricopa, AZ 85138

KBS Playground Tile Repair
Post-Bid
Kaibito, AZ

Downtown Facade Improvements Phase 2
Results
$160,000 to $200,000 est. value
Mesa, AZ 85211

Palo Verde Elementary School Weatherization
Bidding
Casa Grande, AZ 85122

Exterior Repairs for Public Rental Units
Post-Bid
Many Farms, AZ

Last Updated 10/23/2020 10:34 AM
Project Title

WRDU Loading Dock Canopy

Physical Address View project details and contacts
City, State (County) Whiteriver, AZ 85941   (Navajo County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Buy Indian Set-Aside (specific to Department of Health and Human Services, Indian Health Services). The Whiteriver Indian Health Service Hospital requires a contracted project for the installation of a canopy over the Supply Department loading dock area. The scope of work detailed below outlines the required project outcomes. The Contractor shall be responsible for all necessary work to achieve required outcomes including labor, equipment, tools, personal protective equipment (PPE), Authorities Having Jurisdiction (AHJ) coordination, Infection Control and Risk Assessment (ICRA) policy adherence, internal construction permits, incidental design, travel, per diem, TERO fees, and other related expenses required to complete the projectThe Supply Department loading dock is currently unprotected from weather elements. This results in weather damaged shipping containers that are typically cardboard. Damaged containers are at a higher risk of the internal materials or supplies becoming damaged during delivery to departments. The contractor shall install an awning like canopy over the shipping and receiving loading dock. The canopy shall cover the area from the building to six foot over the loading dock pit. The canopy shall extend three foot past the loading dock pit on both sides. The canopy shall be no less than 16’ above driving surface.

Details

Division 09 - Finishes.
Division 10 - Specialties, Protective Covers, Canopies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents