Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Valve Boxes
Infrastructure
Bidding
Madison, WI

Educational Science and Horticulture Site Utility Replacements - GPC
Infrastructure, Alteration
Bidding
$1,600,000 est. value
Madison, WI

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

2021 Road Paving
Post-Bid
McFarland, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Madison - Cambridge, Whitney Way to IH 39/90
Results
Cambridge, Madison, WI 53558

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

Twin Valley Road Improvements
Infrastructure
Bidding

2021 Road Sealcoating
Post-Bid
Marshall, WI

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

2022 Concrete Restoration - Phase I
Infrastructure
Bidding
Madison, WI 53703

Seal coating
Post-Bid
Blue Mounds, WI

North Mendota Trail - West Segment Phase B
Results
Middleton, WI 53562

Mt. Horeb - Black Earth, Vermont Creek Bridge, b-13-0855
Infrastructure
Bidding
WI

Last Updated 03/24/2022 11:38 AM
Project Title

Barbara Street Reconstruction and Jeanne Court Rehabilitation

Physical Address View project details and contacts
City, State (County) Sun Prairie, WI 53590   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct Barbara Street including new watermain and services, sanitary repairs, and storm sewer extensions. Add sidewalks both sides of Barbara Street. Jeanne Court will be a pavement rehabilitation project including new watermain and services and curb & gutter spot repairs.Site Directions: N Bristol Street west on Clara Street, north on Barbara Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents