Similar Projects
Last Updated | 01/31/2020 08:53 AM |
Project Title | Waste Line Replacement at Mountain View High School |
Physical Address | View project details and contacts |
City, State (County) | Mesa, AZ 85213 (Maricopa County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $450,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: 1. Abandon in place existing underground cast iron piping not to disturb the bookstore and kitchen restroom. Cap and seal remaining ends water tight. 2. Saw cut and remove concrete floor at points to install piping liner. 3. Install approximately 324’ of new piping liner in 6” cast iron piping and reconnect outside of building to existing 6” main waste pipe. 4. Install approximately 206’ of new piping liner in4” cast iron piping. 5. Saw cut and remove concrete floor for trenching. 6. Install approximately 230’ of 2” solid core schedule 40 PVC piping in trench and connect to existing cast iron piping. 7. Install approximately 35’ of 3” solid core schedule 40 PVC piping in trench and connect to exiting cast iron piping. 8. Install approximately 62’ of 4” solid core schedule 40 PVC piping in trench and connect to existing cast iron piping. 9. Backfill trenching and pour new concrete floor to match existing. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |