Similar Projects
SZB-2nd & 5th Floor Renovation
Renovation
Post-Bid
$4,800,000 to $5,200,000 est. value
Austin, TX 78722

Retail Space Construction Services
Post-Bid
Austin, TX 78701

Capital Program Management Services
Results
Less than $10,000,000 est. value
Austin, TX 78701

BTL - Campus Infrastructure Upgrades Program
Results
$18,000,000 to $20,000,000 est. value
Austin, TX

IT Remodeling Project
Renovation
Post-Bid
Austin, TX 78701

North Wing Renovation
Renovation
Results
Less than $5,000 est. value
Austin, TX 78722

Renovations at Multiple Building Austin State Supported Living Center
Renovation
Post-Bid
$1,000,000 est. value
Austin, TX 78703

Renovate Walter Webb Hall Floors 3 and 4
Renovation
Results
$3,000,000 to $4,000,000 est. value
Austin, TX 78705

Battle Hall/West Mall Bldg/Goldsmith Hall Mep Upgrades Subcontracting Opportunity
Renovation
Post-Bid
Less than $1,300,000 est. value
Austin, TX 78712

Chilling Station #5 Structural Remediation
Results
$800,000 to $900,000 est. value
Austin, TX 78713

Highland Campus Phase 2-Brand Elements
Term Contract
Post-Bid
Austin, TX

Renovate Courtyard Townes Hall (TNH)
Renovation
Results
$2,800,000 to $3,500,000 est. value
Austin, TX 78705

Seay Faculty Renovation and Clinical Psychology Restructure
Renovation - 8,965 SF
Post-Bid
Austin, TX 78712

2nd and 5th Floor Renovation George L. Sanchez Building (SZB)
Renovation
Results
$10,000,000 to $11,200,000 est. value
Austin, TX 78705

Construction of St John Encampment Commons
Post-Bid
Less than $1,700,000 est. value
Austin, TX 78752

Last Updated 10/08/2020 10:37 AM
Project Title

Elevator Restoration for Welch

Physical Address View project details and contacts
City, State (County) Austin, TX 78713   (Travis County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000 to $160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Restoration of the two passenger elevators in Welch Hall to bring them back to the condition that they were in before the entire building renovation began. Both elevators have had flooding at some point during the construction. Elevator 4 had the top of the hoistway removed and rebuilt. Elevator 5 has had a modification to the smoke venting. It has been three years since the elevators have been in public use. The goal is to have the machine rooms, hoistways, and operational parts of the elevators cleaned, restored, and adjusted to meet the University’s accustomed standard of elevator maintenance. The cab interiors will be replaced on a separate purchase order, but the work will need to be coordinated through the UEM Elevator Project Manager to eliminate having to do things twice. The hall and car fixtures will be restored on a separate Purchase Order and the work will need to be coordinated through the UEM Project Manager. This project will include removing and replacing all of the hall fixtures, car operating panels, and car doors for refinishing by others. Cleaning of the hoistway and car top shall take place prior to the cab interior being replaced. All adjustments and pre-testing shall be complete before calling for final acceptance testing by the UEM Elevator Inspector.

Details

Division 14 - Conveying Equipment, Elevators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents