Similar Projects
Group 4-17-ST 8
Infrastructure
Conception
$5,114,012 CJ est. value
Hawley, PA 18428

SR 4010 over Shadigee Creek
Infrastructure
Conception
$765,000 CJ est. value
Starrucca, PA 18462

SR 670 over Cramer Creek
Demolition, New Construction, Infrastructure
Design
$1,695,350 CJ est. value
Honesdale, PA 18431

SR 652 Slide
Infrastructure
Design
$50,000 CJ est. value
Honesdale, PA 18431

SR 3012 over Wallenpaupack Creek
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Dreher Township, PA 18445

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

The Hideout POA - Tiki Bar and Deck Addition
Addition, Demolition, Renovation, Infrastructure
Results
$324,000 CJ est. value
Lake Ariel, PA 18436

Grove Street Terrace
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Honesdale, PA 18431

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

SR 4041 over Riley Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$1,248,025 CJ est. value
Lakewood, PA 18439

Bucks Cove Road - Grading and Rolling
Infrastructure
Post-Bid
$200,000 CJ est. value
Dyberry Township, PA 18431

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 3020 over Tributary Quinsigamund Lake
Demolition, New Construction, Infrastructure
Design
$1,150,000 CJ est. value
Waymart, PA 18472

Post Frame Storage Building Project
New Construction, Infrastructure - 4,224 SF
Post-Bid
$90,000 CJ est. value
Jefferson Township, PA 18436

Last Updated 11/16/2022 01:32 AM
Project Title

Renovate and Expand Air Conditioning House Units SCI Waymart

Physical Address View project details and contacts
City, State (County) Waymart, PA 18472   (Wayne County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $9,336,256 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1 General - $500,000 - $600,000 .2 HVAC - $1,000,000 - $2,000,000 .4 Electrical - $300,000 - $400,000 Client Agency Requirements - No picture taking, knives, weapons, etc. or tobacco permitted on site. Cell phones must be left in locked vehicles. Masks are not required at this time. Temperature screenings will be required. Those who want to participate in a project site tour after the meeting will need to submit for clearance approval prior to entering secured portion of the facility. SCI Waymart will need the names of everyone who wants to go inside by Wednesday 10/12/22 for gate clearance or they will not be able to go inside the fence/on the tour. Projects located at any Centers for Medicare & Medicaid Services (CMS) Facilities listed on the Department's January 24. 2022, and March 25, 2022, Notices must continue to follow the "Interim Final Rule COVID-19 Vaccination Requirements" and deadlines. Projects at all Non-CMS Facilities are encouraged to follow COVID-19 vaccination requirements. Guidelines and site access requirements vary per site, and some agencies may have more stringent requirements which will be noted in their project's Notice to Bidders. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 10% VBE = 3% .2 HVAC Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 6% VBE = 3% .4 Electrical Construction ALL BASE BIDS (#1, #2 & #3) SDB = NA VBE = NA There is no Bid Guaranty required for this Project. Liquidated damages : = (.1) $160.00 per day, (.2) $370.00 per day & (.4) $130.00 per day. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contract Number C-1578-0010.2 - HVAC Bid Result. Bid Package Name: C-1578-0010 P1.1 Section Name: Base Bid 1: D&M Construction Unlimited, Inc. $736,600.00 Section Name: Base Bid 2: D&M Construction Unlimited, Inc. $790,600.00 Section Name: Base Bid 3: D&M Construction Unlimited, Inc. $844,200.00 Bid Package Name: C-1578-0010 P1.2 Section Name: Base Bid 1: O&M Multi-Trade, Inc. $1,776,172.48 Section Name: Base Bid 2: O&M Multi-Trade, Inc. $1,900,607.60 Section Name: Base Bid 3; O&M Multi-Trade, Inc. $2,119,975.75 Bid Package Name: C-1578-0010 P1.4 Section Name: Base Bid 1:North End Electric $387,700.00 Section Name: Base Bid 2:North End Electric $384,500.00 Section Name: Base Bid 3:North End Electric $395,900.00

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans