Similar Projects
Solon Springs - Superior
Infrastructure
Conception
$500,000 CJ est. value
Poplar, WI 54864

UW Superior - ESPC - 1 MW Solar Array - University of Wisconsin System - Administration
Infrastructure
Design
$1,651,000 est. value
Superior, WI

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Nebagamon Creek Railroad Grade Removal
Infrastructure
Post-Bid
$600,000 est. value
Brule, WI

Barker's Island SOGL Site Improvements Project
Infrastructure
Results
$1,342,025 CJ est. value
Superior, WI 54880

Barker's Island SOGL Site Improvements Project
Infrastructure
Results
$1,342,025 CJ est. value
Superior, WI 54880

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Hill Avenue Interceptor Cured-In-Place Pipe Lining Stinson to Kirk Rolson
Infrastructure
Post-Bid
$2,758,550 CJ est. value
Superior, WI 54880

21st Avenue East Sanitary Sewer Branch Partial Replacement
Infrastructure
Results
$55,736 CJ est. value
Superior, WI 54880

Repaving of Superior Town Hall Parking Lot and Paving of Fire Hall Parking Lot
Infrastructure
Post-Bid
$400,000 CJ est. value
Superior, WI 54880

N 28th St & Tower Avenue Sanitary Sewer Replacement
Infrastructure
Results
$57,232 CJ est. value
Superior, WI 54880

Pickle Pond Remedial and Habitat Design Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Superior, WI 54880

Hazel Prairie Gravel and Pulverize
Infrastructure
Results
$82,669 CJ est. value
Lake Nebagamon, WI 54849

Gandy Dancer Trail Pavilion / Shelter
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Solon Springs, WI 54873

Last Updated 05/15/2023 04:38 PM
Project Title

23rd Avenue East Sanitary/Storm Reconstruction

Physical Address View project details and contacts
City, State (County) Superior, WI 54880   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $142,862 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract shall consist of removing existing sanitary sewer and storm sewer piping and manholes, installation of approximately 300 LF of 8-inch PVC sanitary sewer and 20 LF of 18-inch storm sewer, two precast concrete manholes, reconnecting sanitary laterals, reconstruction of the alley including asphalt surface, and all other incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. Also included is an alternate option of extended (full-length) alley reconstruction. Award of the alternate is at the discretion of the City of Superior ESD.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents