Similar Projects
Last Updated | 10/26/2022 10:05 AM |
Project Title | RFP Construction Manager at Risk - Isaac Bear Early College High School |
Physical Address | View project details and contacts |
City, State (County) | Wilmington, NC 28403 (New Hanover County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected November 2022 , Request For Proposals, Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $40,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The previous solicitation has been included below for reference. The Isaac Bear Early College High School facility will be a collaborative effort between the North Carolina Department of Public Instruction, New Hanover County Schools, and UNCW's College of Education. Advanced planning is being conducted to produce a schematic design and cost estimate. The CMR will assist in advanced planning and design and see the project through construction. Expected Date of Completion of Design 2023 to 2024 depending on stakeholder needs The early college high school (ECHS) model is a postsecondary attainment strategy that research has proven effective in improving graduation rates, narrowing higher education equity gaps, and reducing student loan debts. As an early adopter of the ECHS model North Carolina has 133 Cooperative Innovative High Schools (CIHS) throughout the state. Isaac Bear is one of 11 CIHS schools in the state that partners with a UNC institution. The Isaac Bear Early College High School facility will be a collaborative effort between the North Carolina Department of Public Instruction, New Hanover County Schools, and UNCW's College of Education. Advanced planning is being conducted to produce a schematic design and cost estimate. The CMR will assist in advanced planning and design, and see the project through construction. The project budget includes design, construction, and other project related costs. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |