Project Title | RFP Construction Manager - Multi-Old Main-Macky-Hale Structural Repairs |
Physical Address | View project details and contacts |
City, State (County) | Boulder, CO 80302 (Boulder County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | All Bids Received, Selection Underway, Request for Qualifications, Construction start expected February 2024 |
Bids Due | View project details and contacts |
Estimated Value | $8,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | MARTIN / MARTIN PROJECT No. 15.0276.S.02 The University of Colorado's (CU) founding building, Old Main, built in 1876, needs structural restoration. In its history, structural repair projects have been performed, but never a significant structural/masonry restoration. Old Main has many vertical cracks through its exterior, and a portion of the exterior wythe has both slumped and displaced, which is now being held in place by steel bracing and shoring. In 2018 CU embarked on an effort to assess the structure of Old Main in order to determine work necessary to return the building to a sound condition. In April of 2021, CU received a structural analysis from SGH Engineers that included recommendations for the structural restoration of Old Main. CU has funding to perform a structural, facade, foundation and side restoration of Old Main and is seeking a CMGC for pre-construction and construction services. The scope of services will include assistance to the State during the process of assessment, design, construction, and warranty period. Specific tasks to be performed by the Construction Manager/General Contractor (CM/GC) include those generally performed by the CM/GC construction community where the Construction Manager is also the Contractor. A sample copy of the State's CM/GC contract is contained within the RFP, which is the responsibility of a proposing firm to review this document in detail as it details services/responsibilities of the CM/GC. A Guaranteed Maximum Price (GMP) will be required at the completion of Design Development phase. Date Email Questions Due 11/17/2022 5:00 pm Date Email Answers Issued 11/22/2022 Interview Short List Announced 12/15/2022 Sealed Proposal Due (Evaluation and Award: Step II) 12/22/2022 2:00 pm Oral Interviews 1/05/2023 Selection Announced 1/06/2023 Negotiation of CM/GC Contract 1/09-1/27 2023 Contract Approval (projected) 01/30/2023 Anticipated Design Start 11/01/2022 Anticipated CM/GC Start Start 02/26/2024 Anticipated Construction Start/Finish Finish 11/29/2024 - Structural restoration o Brick structure and facade, including all exterior and inner wythes of brick o Interior joist pockets at stone foundation to brick wall interface - Historic masonry restoration o Brick, stone, mortar, facade, foundation, and entrances o Early procurement of brick, stone, and mortar to match existing - Historic exterior door restoration - Historic exterior handrail and spiral staircase restoration -Historic window replacement o Interior architectural scope as related to window replacement - Below grade foundation waterproofing and drainage - Roof truss repair - Roofing maintenance - Roof access improvements - Site and landscape reconstruction to honor historic site as part of Norlin Quad - Building and site drainage (above and grade), landscaping, hardscapes, irrigation, and site lighting - Reconstruction of 200 lineal feet of Pleasant Street |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |