Similar Projects
14th Street Lift Station Improvements - SEW-23-002 - City of Burlington
Infrastructure
Conception
$120,000 CJ est. value
Burlington, IA 52601

South Street Lift Station Replacement - SEW-23-001 - City of Burlington
Infrastructure
Conception
$4,700,000 CJ est. value
Burlington, IA 52601

Market Street Forced Main Replacement - 5455-732 - SEW-22-002 - City of Burlington
Infrastructure
Design
$4,000,000 CJ est. value
Burlington, IA 52601

Cascade Equalization Tank - SEW-24-001 - City of Burlington
Infrastructure
Design
$4,620,000 CJ est. value
Burlington, IA 52601

2023 Seal Coat Streets Resurfacing
Infrastructure
Bidding
$407,566 CJ est. value
Burlington, IA 52601

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

RFQ Construction Manager - Construction Management (CM) Services for Healthcare Facility Expansion
Addition, Demolition, Renovation, Infrastructure - 1,640 SF
Post-Bid
West Burlington, IA 52655

2022 ADA Improvement Project - 2nd Letting
Infrastructure
Results
$164,139 CJ est. value
Burlington, IA 52601

2700 Main Street Storm Improvements
Infrastructure
Results
$35,399 CJ est. value
Burlington, IA 52601

Washington Street Improvements - STR-23-008 - City of Burlington
Infrastructure
Conception
$4,200,000 CJ est. value
Burlington, IA 52601

Courthouse Parking Lots Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Burlington, IA 52601

Additions and Renovations to Burlington High School
Addition, Demolition, Renovation, Infrastructure
Results
$25,704,448 CJ est. value
Burlington, IA 52601

Mason Road Detention Expansion - SEW-22-006 - City of Burlington
Infrastructure
Conception
$200,000 CJ est. value
Burlington, IA 52601

Marshalls - Burlington
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Burlington, IA 52601

PCC Pavement - Grade and New
Infrastructure
Results
$1,374,541 CJ est. value
Sperry, IA 52650

Last Updated 06/14/2023 12:06 PM
Project Title

ADDS 2023 Administration Building Addition

Physical Address View project details and contacts
City, State (County) Burlington, IA 52601   (Des Moines County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $508,573 [brand] Estimate
Plans Available from Construction Manager - 04/21/23
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Adds 2023 Proposed New Administration Building Addition. 2290 Sf Wood Framed Administration Facility To Be Located At 1340 Mt. Pleasant St., Burlington, Iowa 52601 Prime contracts will be awarded for various Bid Packages to the lowest responsible bidder. BP#1 Sitework BP#2 Concrete BP#3 Masonry BP#4 General Construction, Div. #6 Carpentry & Div. #10 Specialties BP#5Thermal & Moisture BP#6 Openings BP#87 Finishes - Insultaion, Drywall & Paint BP# Finishes - Floor Covering BP#9 Finishes - Acoustical Ceiling Tile(ACT) BP#10 Plumbing BP#11 HVAC BP#12 Electrical & Low Voltage Estimated Project Cost: $658,000.00

Details

2,290 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents