Similar Projects
Town Hall Exterior Painting
Renovation
Design
$200,000 CJ est. value
Conesus, NY 14435

Pavement Marking Services
Term Contract
Sub-Bidding
Glen Cove, NY 11542

3M Pavement Marking and Auto Detailing Supplies
Term Contract
Sub-Bidding
Mineola, NY 11501

Exterior Repair and Painting Seely Place Elementary School
Post-Bid
Scarsdale, NY

Courthouse Exterior Painting
Post-Bid
Geneseo, NY 14454

Wallpaper Removal and Painting
Alteration
Results
Niagara Falls, NY 14301

Regional Bridge Painting Project and Minor Steel Repairs
Alteration
Results
$2,300,000 est. value

Painting of numerous offices in New Rochelle City Hall
Renovation
Sub-Bidding
$60,000 CJ est. value
New Rochelle, NY 10801

Fire Escape Painting
Post-Bid
Poughkeepsie, NY 12601

Maintenance Painting of Apartments
Alteration
Results
Brooklyn, NY 11236

Campus Painting
Alteration
Post-Bid
Troy, NY

SMD Services Maintenance Painting of Apartments-Mitchel Houses
Alteration
Results
Bronx, NY 10454

CD 21088 Greenwood, CD 21042 Mcchesney Painting
Alteration
Post-Bid
East Greenbush, Troy, NY 12061

SMD Services Maintenance Painting of Apts Eastchester Gardens and Middletown Plaza
Alteration
Results
Bronx, NY 10469

Power Wash & Painting For Lukoil Service Stations In NJ, NY & PA
Alteration
Post-Bid

Last Updated 09/16/2022 01:04 PM
Project Title

Basement painting

Physical Address View project details and contacts
City, State (County) Farmington, NY 14425   (Ontario County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $160,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Martz IRA Basement Painting The Finger Lakes DDSO is soliciting bids for Basement Painting at our Martz IRA. This is a NYS public works project and prevailing wages must be paid. Location: Martz IRA, 5700 Martz Rd, Farmington, NY 14425 Contract term: 30 days after completion of project SCOPE OF WORK includes, but is not necessarily limited to the following: Complete Interior painting of residence basement; Walls, Ceilings, Doors and Trim, etc. 1. Price quote shall include all materials (paint, stain, necessary tools and accessories) and labor. 2. The first coat on the cinder block walls will be UGL Original Drylock low VOC sealer applied per manufacturers directions. 3. Paint, stain and other finishes must be a SHERWIN WILLIAMS product. The color slate violet sw9155 will be used on the cinderblock walls, white on the drywall walls and ceiling, and on the rocks sw7671 will be used for the trim and doors. 4. House accessibility to be determined by House Director. 5. Remove furniture as required and return to place when job is complete. 6. Disconnect/Remove appliances as required and return/re-connect when job is complete. 7. Removal all pictures, outlet and switch covers and return to place when job is complete. 8. Remove all electronics if needed and return/re-connect to place when job is complete. 9. Imperfections (eg: Holes gouges, and dings) on wall and ceiling surfaces shall be filled with a proper spackling compound. Then sanded smooth and primed before a top coat to prevent flashing. 10. Clean and prepare surfaces to be painted per the manufacturer's written instructions for each substrate condition and as specified. The price is to include wall paper and sizing removal and spackling of all damaged wall surfaces prior to painting. All surfaces must be sanded after patching to match existing surface to ensure invisible repairs then primed before applying topcoat. 11. Paint used in the basement shall include a mold inhibitor. 12. Ceiling paint shall be a flat finish, except in Bathrooms/Kitchens where a semi-gloss finish should be used. 13. Paint used on walls and trim must be a semi-gloss finish. 14. A clear satin low VOC coating to be applied to all-Natural Wood trim and doors if needed. 15. Any stains on ceilings and walls shall be primes, with a stain killing primer to prevent bleed-through of topcoat. 16. All surfaces shall have two (2) coats of paint minimum; three (3) or more if necessary, for complete coverage, same for varnish's if applicable. 17. Apply paints and stains by brush and roller only, per the manufacturer's written instructions. Use primer as recommended by manufacturer. 18. Use drop cloths to cover stationary furniture, flooring, appliances, etc. 19. See attached floor plan for work that needs to be addressed on a room-to-room basis. 20. Sprinkler heads, fire alarm pull stations, smoke detectors, and heat detectors must be free of any paint when the job is complete. 21. Remove and dispose of any empty cans, rags, rubbish, masking and other rubbish materials at the end of each work day. 22. Clean glass and paint spattered surfaces by scraping and washing.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents