Similar Projects
White Mountain Apache Tribe Water Settlement - U0164 - City Of Avondale
Alteration
Conception
$2,800,000 est. value
Whiteriver, AZ 85941

Construct Runway 2/20 (60' x 4,712') - City of Show Low
Infrastructure
Conception
$5,000,000 CJ est. value
Show Low, AZ 85901

Jr's Shop Addition
Addition, Demolition, Renovation, Infrastructure - 1,400 SF
Design
$280,000 CJ est. value
Joseph City, AZ 86032

Pre-Settling Pond Upgrades for the White Mountain Apache Tribe
Infrastructure
Design
$275,150 CJ est. value
Whiteriver, AZ 85941

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

System Enhancement (Safety Improvements)
Infrastructure
Results

Pavement Preservation
Infrastructure
Results
$7,128,000 est. value
AZ

Family Dollar #24436 / Holbrook
New Construction, Infrastructure - 10,547 SF
Construction
$199,999 CJ est. value
Holbrook, AZ 86025

Hashknife Solar Energy Center
Infrastructure
Pending Verification
$100,000,000 CJ est. value
Holbrook, AZ 86025

Frontier Park Playgound and Splash Pad - City of Show Low
New Construction, Infrastructure
Pending Verification
$1,200,000 CJ est. value
Show Low, AZ 85901

Construct Two Large Helicopter Parking Pads - City of Show Low
Infrastructure
Conception
$600,000 CJ est. value
Show Low, AZ 85901

Fort Defiance N112 Road Improvements 3.06-Miles
Infrastructure
Post-Bid
AZ

Z--Expedited Repair of 8-Inch Sewer Main Line
Term Contract
Results
Pinon, AZ 86520

Big Dog at White Mountain Lake Storage
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Show Low, AZ 85901

Last Updated 04/22/2023 05:05 AM
Project Title

E. McNeil Roadway Improvements

Physical Address View project details and contacts
City, State (County) Show Low, AZ 85901   (Navajo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $592,661 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 21 the project was awarded to PERKINS CINDERS INC for $592,661.26. Work includes, but is not necessarily limited to removing the existing asphalt and ABC section of approximately 2,000 Linear Feet of East McNeil, installing a geogrid and a new 4" AC on 8" ABC asphalt section. The work also includes installing sections of new curb, new sidewalk, ADA ramps, driveways, and new drainage infrastructure to facilitate the new improvements. The work includes all required labor, material, incidentals, transportation, traffic control, and services required for the project to complete a usable and operable facility in accordance with all pertinent codes and regulations as necessary to complete the job in a workmanlike manner as shown on the Construction and Bid Documents. The work shall take place along East McNeil from Central Avenue to North 8th Street in Show Low Arizona.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents