Similar Projects
District-Wide Maintenance of Mitigation Sites and Stormwater Ponds
Bidding

Pent Street and Grosse Avenue Drainage and Roadway Improvements
Bidding
Less than $3,496,724 est. value
Tarpon Springs, FL 34689

SPC Stem Center Living Shoreline
Post-Bid
Less than $100,000 est. value
Saint Petersburg, FL 33733

Channel 1 Concrete Panel Replacement West of 66th Street
Post-Bid
Pinellas Park, FL 33781

Craig Park Seawall Restoration
Results
Less than $310,200 est. value
Tarpon Springs, FL 34688

Mckay Creek Water Quality Improvement Project
Results
Less than $793,140 est. value
Clearwater, FL

Lakeview Road ADA Ramps and Drainage Improvements
Bidding
Less than $1,572,017 est. value
Clearwater, FL 33756

Channel 5 Rip Rap Repairs Project
Post-Bid
Less than $100,000 est. value
Pinellas Park, FL 33781

Splash Pad
Results
Madeira Beach, FL 33708

Football Field Drainage Renovation Lakewood High School
Post-Bid
$165,000 est. value
FL

Idlewild Drive Ditch Conversion to Culvert with Shallow Swale
Results
Less than $185,000 est. value
Dunedin, FL 34697

Stormwater Pond Maintenance
Post-Bid

Pinellas Trail and 54th Avenue North Drainage Improvements (Pid # 000183A)
Results
$2,479,385 est. value
FL

Dodecanese Boulevard Tidal Flooding Improvements
Results
Less than $135,000 est. value
Tarpon Springs, FL 34688

2019 City Seawalls
Results
$100,000 est. value
Clearwater, FL 33755

Last Updated 03/19/2019 09:33 AM
Project Title

Waterfront Park Living Shoreline and Spring Feature

Physical Address View project details and contacts
City, State (County) Safety Harbor, FL   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Waterfront Park Living Shoreline and Spring Feature includes in general, but is not limited to the following work: - Demolition of existing sea wall, existing concrete, and existing concrete headwall - Demolition of existing HDPE pipe - Clearing and Grubbing - Excavation and Embankment - Grading - Installation of HDPE drainage pipe - Installation of a Flared End Section - Installation or Rip Rap - Installation of Coarse Aggregate: Oyster Shell for Oyster Bags - Installation of Geosynthetic Materials - Installation of Oyster Bags - Installation of Fine Aggregate - Removal and Installation of existing concrete sidewalk, curbing and pavement - Installation and watering of sod - Maintenance of vehicular traffic on Veteran's Memorial Lane - Maintenance of pedestrian traffic at Waterfront Park
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents