Similar Projects
Doheny Ocean Desalination Plant - South Coast Water District
New Construction, Infrastructure
Conception
$110,000,000 CJ est. value
Dana Point, CA 92624

Headworks Grit Cyclone Replacement - City of San Clemente
Renovation
Conception
$600,000 CJ est. value
San Clemente, CA 92672

Activated Sludge Clarifier Repairs at Plant No 2
Renovation, Term Contract
Post-Bid
$4,836,000 est. value
Fountain Valley, CA 92708

Groundwater Treatment Plants, Anaheim Phase B Offsite Pipeline Upgrades Project
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Anaheim, CA 92805

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Rebuild Shop Fume Extractor Installation at Plant NO 1
Renovation
Results
$234,000 est. value
CA

Primary Clarifier 1,2 and 3 Rehabilitation - City of San Clemente
Renovation
Conception
$500,000 CJ est. value
San Clemente, CA 92672

Digester Gas Facilities Rehabilitation - J-124 - Orange County
Renovation
Post-Bid
$117,000,000 CJ est. value
Fountain Valley, CA 92708

Baker Water Treatment Plant Diesel Storage Tank
Infrastructure
Results
$5,625,518 CJ est. value
Lake Forest, CA 92630

Recycled Water Storage Bay Rehabilitation - City of San Clemente
Renovation
Conception
$500,000 CJ est. value
San Clemente, CA 92672

Water Reclamation Plant Security Gates, Contract A
Renovation
Post-Bid
$144,125 CJ est. value
San Clemente, CA 92672

Calafia Pump Station Flow Meter and Vault Replacement
Renovation, Infrastructure
Results
$79,500 CJ est. value
San Clemente, CA 92672

Sludge Dehydration System - City of San Clemente
Renovation
Conception
$2,280,000 CJ est. value
San Clemente, CA 92672

Electrical Power Distribution System Improvements - Orange County Sanitation District
Renovation
Post-Bid
$16,669,850 CJ est. value
Fountain Valley, CA 92708

Primary Sedimentation Basin G Dome Post Repair at Plant No. 2
Renovation
Results
$248,600 CJ est. value
Huntington Beach, CA 92646

Last Updated 05/08/2023 12:05 PM
Project Title

Water Reclamation Plant (WRP) Odor Control Systems Replacement - City of San Clemente

Physical Address View project details and contacts
City, State (County) San Clemente, CA 92672   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $6,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

WRP Odor Control Systems Replacement As of September 2, 2022, this project is currently in the FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents