Similar Projects
E.D. Sherman Substation 115 Kv Equipment Upgrade
Renovation
Sub-Bidding
$1,000,000 CJ est. value
North Attleboro, MA 02760

New Lightning Protection System
Renovation
Sub-Bidding
$20,000 CJ est. value
Fall River, MA 02720

Photovoltaic Systems and Associated Equipment Maintenance, Repair, and Upgrade
Alteration
Post-Bid
$343,000 est. value

Four (4) 250KVA Stepdown Overhead Transformers and Four (4) 333KVA Stepdown Overhead Transformers
Alteration
Post-Bid
Taunton, MA

115Kv Switchyard Site and Electrical Installation Work
Alteration
Results
$3,000,000 est. value
Taunton, MA 02780

New PFAS Facility, Cate Springs Well - Sub Bid
Alteration
Results
$450,000 est. value
Mansfield, MA

50KVA Single Phase Padmount Transformers
Alteration
Post-Bid
Taunton, MA

Miscellaneous Electrical, Data and Security Upgrades for the Freetown Police Station
Alteration
Results
$24,000 est. value
Freetown, MA 02717

Dion Chiller Replacement - Sub Bid
Alteration
Post-Bid
$1,392,000 est. value
Dartmouth, MA

Community Center Upgrades at the Elise Circle Development 667-1 - Filed Sub- Bids
Alteration
Results
$215,087 est. value
North Easton, MA

Pole Mount Transformers
Alteration
Post-Bid
Taunton, MA 02780

Harold H. Galligan School Window, Exterior Door and Boiler Replacement Project - Sub-Bids
Alteration
Results
$1,350,000 est. value
Taunton, MA 02780

Weatherization And Electrical Work
Term Contract
Post-Bid
Fall River, MA 02724

Walsh Well PFAS Treatment, Plant Upgrades - Sub Bids
Alteration
Results
$6,000,000 est. value
Mansfield, MA 02048

Electrical Contract Services for Maintenance and Repairs in School Buildings
Alteration
Post-Bid
Somerset, MA

Last Updated 05/31/2023 08:52 AM
Project Title

Wastewater Treatment Facility Headworks HVAC System Improvements 2023 - Sub-Bids

Physical Address View project details and contacts
City, State (County) North Attleboro, MA 02763   (Bristol County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Subtrades: Electrical Work Miscellaneous and Ornamental Iron The work consists of but is not limited to the demolition of existing HVAC, and electrical equipment and systems in the Headworks, and the installation of new HVAC equipment and systems (including unit heaters, exhaust fans, new boiler system, and associated controls), electrical systems (including wiring to support HVAC equipment, and gas detection systems), and structural work to support the HVAC improvements. The work also includes limited replacement of grating in the Headworks. All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website Question Deadline 03/18/2023 The Work includes the following major items: a. Selective demolition. b. Architectural work 1) Restoration of finishes c. Structural work 1) Infill and penetrations of walls and floors. 2) Indoor equipment pads 3) Replacement of headworks channel grating system 4) Equipment supports and other miscellaneous items d. HVAC Work 1) Exhaust fans to serve the headworks (wet) portion of the building, which is a class 1, division 1 area. 2) Hot water boiler plant, pumps, and accessories 3) Hot water piping distribution system 4) Stainless steel and FRP ductwork 5) Heating terminal equipment 6) Automatic Temperature Controls e. Electrical Work 1) System upgrades to support the new HVAC equipment. 2) Hazardous gas detection systems f. Plumbing Work 1) utility sink 2) domestic water heater 3) gas piping EXISTING SYSTEM DESCRIPTION A. The existing building is a 7,000 square foot building in an operating waste treatment plant the building is split into two portions: The first portion is a single story, 2,500 square foot headworks. The headworks is a Class 1, Division 1 space. The remaining portion is a dual level (on grade and lower level) dry area, consisting of a control room on the upper level, and septage pumps, piping, and chemical storage areas on the lower level. B. The boiler system is a small, oil-fired cast-iron hot-water boiler that only serves unit heaters. There are three gas-fired makeup air units on the roof, all of which have failed and are not operable. C. The goal of this project is to restore proper ventilation to the headworks and provide adequate boiler capacity to provide ventilation to both the headworks and to the dry areas of the building. The ventilation equipment for the dry areas will be installed as part of a planned future project, and is not part of the Work of this project.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents