Similar Projects
Last Updated | 04/07/2021 02:52 PM |
Project Title | Madison Water Treatment Plant Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Madison, GA 30650 (Morgan County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of existing Mueller gate valves and replacing them with new quarter turn valves equipped with electronic rotary actuators. Remove the twelve existing valves and to supply and replace with new quarter turn valves equipped with electronic rotary actuators to control the opening and closing of each valve. Each panel will be equipped with three (HOA), Hand, Off, Auto switches, to control each corresponding valve actuator. Provide, valves, actuators, all necessary wiring, and conduit to supply 120-volt power for (HOA), switches to and from actuators located below filters on the first floor of the facility. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |