Similar Projects
Olive Branch Road Development
New Construction
Conception
Durham, NC

Griffin Place
New Construction
Conception
Durham, NC

Sherron Road Residential
New Construction
Design
$24,000,000 est. value
Durham, NC 27703

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

Southern Durham Resurfacing Package, Milling
Infrastructure
Bidding
$180,000 CJ est. value
Durham, NC 27701

Celeste Circle Force Main
Infrastructure
Bidding
$7,000,000 CJ est. value
Chapel Hill, NC 27517

Short Line Thermoplastic Pavement Marking Installation and Pavement Marking Removal
Infrastructure
Sub-Bidding
$70,000 CJ est. value
Durham, NC 27704

DPS Phase I District Wide Water Fountain Replacement
Infrastructure
Sub-Bidding
$130,000 CJ est. value
Durham, NC 27701

Stabilizations
Post-Bid
Durham, NC 27704

Wake County and Durham County Weatherization Assistance Program
Term Contract
Post-Bid

Reconstruction of Burn Unit (1258 Wabash)
Results
Durham, NC 27701

Reconstruction of Burn Unit (1229 Dayton)
Results
Durham, NC 27701

Northern Durham Convenience Site Construction
Construction
Less than $2,470,000 est. value
Rougemont, NC 27701

Leesville Road Assemblage
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Durham, NC 27703

Leesville Road Assemblage Residential
New Construction, Infrastructure
Pending Verification
$130,000,000 CJ est. value
Durham, NC 27703

Last Updated 08/05/2022 03:09 PM
Project Title

Demolition - 1506 North Hyde Park Avenue Aka 1508 North Hyde Park Avenue

Physical Address View project details and contacts
City, State (County) Durham, NC 27703   (Durham County)
Category(s) Heavy and Highway, Residential, Single Trades
Sub-Category(s) Environmental, Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All attendees must follow all City of Durham mandates as it relates to COVID-19. The City of Durham reserves the right to reject any or all bids, waive informalities, and/or accept such bid as appears in its judgement to be in the best interest of the City.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents