Similar Projects
Fuel Farm Improvements - Phase III - General Bid
Bidding
$1,700,000 est. value
Nantucket, MA 02554

Fuel Farm Improvements - Phase III - Filed Sub-Bid
Bidding
Less than $1,700,000 est. value
Nantucket, MA 02554

Fuel Storage and Day Tank Systems Replacement - Gillis Pump Station, Hayes Pump Station and Lexington Street Pump Station - General Bids
Post-Bid
Less than $1,729,000 est. value
Stoneham, Wakefield, Waltham, MA

Replace Tanks, Furnace, and Hydro Heaters at Buffumville Lake, Charlton, MA
Post-Bid
Charlton, MA

Environmental Monitoring Services at Crapo Hill Landfill
Results
New Bedford, MA

Removal of 7500 Gallons Above Ground Tank
Results
Boston, MA

Landfill Gas Flare Replacement
Bidding
Orleans, MA

Shrewsbury Pump Station Underground Storage Tank Removal Project
Post-Bid
Less than $30,000 est. value
Shrewsbury, MA 01545

Install New Liner on Sodium Hypochlorite Tank
Results
Less than $24,000 est. value
Boston, MA

Removal and Disposal of Two 10,000-Gallon Heating Oil Tanks at Marsh Grammar School
Bidding
Methuen, MA 01844

Underground Storage Tank Upgrades at the Everett Department of Public Works
Post-Bid
Less than $133,000 est. value
Everett, MA 02149

Landfill Gas Collection and Flaring System Monitoring Services
Term Contract
Results
$47,744 est. value
Natick, MA 01760

Materials for Gas Construction
Post-Bid
Less than $100,000 est. value
Westfield, MA 01085

Landfill Site Preparation
Results
$225,000 est. value
Clinton, MA 01510

Annual Aviation Fuel Farm Inspections and Maintenance Services
Post-Bid
Less than $130,000 est. value
Nantucket, MA

Last Updated 05/20/2020 03:58 PM
Project Title

Monson Development Center - Landfill and Fuel Storage Tank Closure

Physical Address View project details and contacts
City, State (County) Palmer, MA   (Hampden County)
Category(s) Environmental, Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,329,350
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the excavation, relocation, and capping of historically placed debris/fill at the Monson Developmental Center. This project also consists of the closure and removal of two 100,000- gallon concrete underground storage tanks (USTs) and removal of two 20,000-gallon steel aboveground storage tanks (ASTs).

Details

Division 02 - Existing Conditions, Subsurface Investigation, Landfill Construction and Storage.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents