Similar Projects
Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Sanitary Sewer Lining
Results
$175,000 est. value
Sharon Hill, PA 19079

Sanitary Sewer Cleaning
Results
Johnstown, PA 15905

Big Heart Pet Brands Wastewater Improvements
Renovation
Construction
Bloomsburg, PA

Construct a Small Flows Treatment Facility on their Parcel of Land Located Near the Intersection of Meadowood Road and Emery Church Road
Post-Bid
State College, PA

Sanitary Sewer Improvement Project
Results
Masontown, PA

Saint Michael Pennsylvania South of Salix Sewer Extension Project - General
Post-Bid
Forest Hills, PA 15221

Woodland Avenue CCTV Project
Results
Waynesburg, PA

2020-2021 Maintenance of Sanitary Sewer Collection System
Term Contract
Post-Bid
Aliquippa, PA 15001

Sanitary and Storm Water Cipp Project
Results
Lock Haven, PA 17745

Pre-Cast Catch Basins
Post-Bid
Greensburg, PA 15601

Dawson Ridge Sanitary Sewer Rehabilitation
Results
Beaver, PA

Manhole Castings
Post-Bid
Altoona, PA 16601

CDBG Sewer Rehabilitation Project - Phase I
Results
Waynesburg, PA 15370

Last Updated 09/17/2020 09:29 AM
Project Title

2021 Inflow and Infiltration Project

Physical Address View project details and contacts
City, State (County) Fairless Hills, PA 19030   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the 2021 Inflow & Infiltration Project consists of the cleaning, televised inspection, pressure testing and grouting of joints, and cured-in-place manhole to manhole lining of the sanitary sewer mains, as well as manhole rehabilitation and televised inspection of sanitary laterals, in Falls Township, Bucks County, Pennsylvania. The Contractor shall chemically seal only the joints that are determined to be leaking as a result of the pressure test. The grout or chemical joint sealant shall have a root inhibitor admixture. Each joint should be pressure tested prior to the grouting operation. Any manholes that are visibly leaking shall be brought to the attention of the Resident Inspector or Engineer prior to sealing any manholes. The Engineer or Resident Inspector will advise the Contractor where to perform “if and where directed” work. All sanitary laterals must be inspected from the sanitary sewer main to the cleanout.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents