Similar Projects
Liner Pipe / Cured-In-Place-Pipe (Cipp) / Joint Seals
Term Contract
Results

Howard Street Storm and Waterline Improvements, OPWC FY19 CDBG FY18
Results
Less than $1,614,100 est. value
Findlay, OH 45840

West Melrose Avenue 12-Inch Waterline
Results
Less than $154,802 est. value
Findlay, OH

Waterline Project
Results
Less than $210,000 est. value
OH

Rutherford Avenue 6-Inch Waterline Project
Results
Less than $132,000 est. value
Findlay, OH

Construction of the North Main Street Waterline Replacement Project
Post-Bid
Less than $95,000 est. value
Arlington, OH

Olive Street 16-Inch Waterline Extension Project
Results
Less than $525,000 est. value
Findlay, OH

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Sixth Street Waterline Replacement
Results
Less than $550,000 est. value
Findlay, OH

Township Road 107 Waterline
Results
Less than $161,986 est. value
Findlay, OH 45840

Penrose Public Infrastructure
Results
Less than $86,295 est. value
Findlay, OH 45840

McComb Water Line Replacement - Phase 2
Results
Less than $765,000 est. value
McComb, OH

Fire Hydrants
Term Contract
Results
Findlay, OH

Iron Pipe
Results
Findlay, OH

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Reported 03/04/2020 11:44 AM
Project Title

Olive Street 8-Inch Waterline Replacement

Physical Address View project details and contacts
City, State (County) Findlay, OH 45840   (Hancock County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $130,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of installing a new 8-inch C909 waterline on Olive Street., running along the south side of the roadway, in the center westbound lane of Olive Street., from S. Main Street to the west side of Fairmount Drive. The new waterline will need to be directional drilled under S. Main Street to the west side of the southbound curb, to tap onto the existing 6-inch line. This project shall consist of, but not limited to, 960 LF of 8-inch C909 waterline, 100 LF of 8- inch directional drill (alternate), 100 LF of 6-inch waterline, full depth pavement repair, waterline tie-ins, waterline abandonments, fire hydrant removal, hydrant replacement, misc. fittings, seeding and mulching.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents