Similar Projects
Deubrook Area Schools Track and Field
Renovation, Addition
Results
Brookings, SD

Chairlift Replacement Site Package
Results
Less than $335,533 est. value
Sioux Falls, SD 57110

Safe Haven Animal Hospital Apartments
New Construction, Renovation - 3,000 SF
Construction
$75,000 est. value
Mitchell, SD 57301

Deer Mountain Residential Redevelopment
New Construction, Infrastructure
Conception
SD

Harbach Park Phase 1 and Phase 2
New Construction
Post-Bid
$1,000,000 est. value
Custer, SD

Ipswich City Park - Phase 1 Improvements
Renovation
Post-Bid
$150,000 est. value
Ipswich, SD

The Crimson Apartments
New Construction, Infrastructure
Conception
$13,000,000 est. value
Sioux Falls, SD 57108

Inclusive Playground Storybook Land at Wylie Park
New Construction
Results
$128,500 est. value
Aberdeen, SD

Roads and Parking Lot Improvements
Results
Less than $287,503 est. value
Sioux Falls, SD 57104

Rock Terrace Retaining Wall - Falls Park Improvements
New Construction
Results
$288,000 to $437,536 est. value
Sioux Falls, SD

Track and Field Reconstruction Yankton High School
Results
Yankton, SD 57078

President’s Garden
Renovation
Post-Bid
$400,000 est. value
Vermillion, SD

Last Updated 10/05/2021 04:31 PM
Project Title

Green Infrastructure Improvements - Tuthill Park and Timber Oak Drive

Physical Address View project details and contacts
City, State (County) Sioux Falls, SD 57103   (Minnehaha County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope involves the renovation of two existing detention areas and includes clearing, earthwork, drainage structures,storm sewer and landscape

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents