Similar Projects
2021 Sewer Line Rehabilitation Project
Bidding
Clifton, CO 81520

2021 Preventative and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO

Denver Coliseum Storm Drain Repair
Post-Bid
Denver, CO 80202

Cherry Creek Interceptor Project
Post-Bid
Parker, CO

Storm Drainage Rehabilitation and Improvements
Results
Longmont, CO 80501

2020 Cherrymoor South Interceptor Rehabilitation
Results
Cherry Hills Village, CO 80113

Cherry Creek Interceptor Project - Trenchless Construction Portion
Post-Bid
Parker, CO

South Englewood Storm Sewer Maintenance
Results
Englewood, CO 80110

CR Water Projects Request for Pre-qualifications
Post-Bid
Castle Rock, CO 80104

2019 Ridge Road Storm Sewer Project
Results
Less than $248,850 est. value
Littleton, CO 80120

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

2020 Townwide Storm Pipe Camera and Vacuum Cleaning
Results
$30,000 to $50,000 est. value
Parker, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Tollgate and Sand Creek Interceptor Diversion Structures Rehabilitation Phase 2
Results
$3,210,000 to $3,370,500 est. value
Aurora, CO 80012

Stormwater Facility Maintenance
Post-Bid
Canon City, CO

Last Updated 10/05/2020 03:53 PM
Project Title

26th Ave Storm Sewer Construction

Physical Address View project details and contacts
City, State (County) Edgewater, CO   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City seeks a contractor with a reliable, experienced, and qualified history in storm sewer installation services in a comprehensive, timely, and efficient manner. The scope of work for the contractor includes but is not necessarily limited to the following: Work includes installation of two (2) combined inlets, three (3) manholes, approximately 620 LF of 18” storm sewer piping and making connections to three existing structures. The proposed inlets and manholes will be precast concrete and the pipe material can be RCP, thick-walled PVC, or thick-walled Polypropylene (ADS HP Storm).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents