Similar Projects
Last Updated | 08/30/2022 10:36 AM |
Project Title | Springdale Blacks Canyon Restoration |
Physical Address | View project details and contacts |
City, State (County) | Springdale, UT 84767 (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $984,047 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Bid includes furnishing all labor, materials, transportation, and services to implement channel grading and installation of stabilization structures along approximately 3,000 linear feet of the Blacks Canyon Wash; installation of rock rip-rap erosion protection and concrete block retaining walls along the wash; and installation of a 60' pedestrian bridge (furnished by the Town of Springdale) across the wash, including construction of concrete abutments, access ramps and steps, and erosion protection. Copies of the Contract Documents may be obtained by contacting Rosenberg Associates at heatherh@racivil.com or at the offices of Rosenberg Associates on or after Wednesday, June 22nd, at 352 East Riverside Drive, Suite A-2, St. George, Utah, 84790. All Bidders who submit a bid are required to obtain a set of the Contract Documents. A 100% performance, labor and materials bond will be required on this project. Every Bid shall be accompanied by a bid bond in the amount of 5% of the bid, naming the Town of Springdale as Owner. Bonds must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the Town of Springdale. The Town of Springdale reserves the right to reject any, or all bids, or to waive any formality or technicality in any bid, in the interest of the Owner. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |