Similar Projects
Redevelopment of Wells at the John S. Roth Wellfield
Term Contract
Bidding
Middletown, CT

KSB Model KRT K 100-251/164XG Submersible Pump
Post-Bid
New Canaan, CT

Well Pump Installation
Infrastructure
Post-Bid
Woodbury, CT 06798

John S. Roth Wellfield Improvements
Results
$1,700,000 est. value
Middletown, CT

Chemical Improvements at the North Sleeping Giant Wellfield
Results
Hamden, CT

USCG Replace Condensate Receiver Pump Sets
Term Contract
Post-Bid
$100,000 to $150,000 est. value
New London, CT 06320

Well Testing and Drilling Services
Results
Less than $82,150 est. value
Mansfield Center, CT 06250

Godwin 4 IN. Dri-Prime HL 125M Emergency Water Pump 2021
Infrastructure
Post-Bid
Waterbury, CT

Occum Hall Fire Pump Replacement Project
Results
Windham, CT 06226

Replace Chilled Water Pump CHWP-4
Infrastructure
Post-Bid
Farmington, CT

High Rise Geothermal Heat Pumps Replacement
Results
$197,800 est. value
Windham, CT 06226

John C. Daniels Booster Pump Replacement
Term Contract
Post-Bid
New Haven, CT 06519

Grinder Pump for Low Pressure Sewer Collection System
Results
Waterford, CT

Goodwin Park Irrigation and Booster Pump Improvements
Infrastructure, Alteration
Post-Bid
Hartford, CT

Rehabilitation and Reconditioning of Fish Wells at Two State DEEP Hatcheries
Results
Kensington, CT

Last Updated 12/16/2021 04:31 AM
Project Title

Mauro Sheridan Booster Pump Replacement

Physical Address View project details and contacts
City, State (County) New Haven, CT 06515   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The failing booster pumps are causing water pressure problems such as lack of pressure to flush toilets.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents