Similar Projects
College of Business Construction
New Construction
Conception
Bowling Green, KY

Funkhouser Building Improvements
Renovation
Conception
$110,000,000 est. value
Lexington, KY 40508

Center College Wellness Sports Expansion
New Construction - 135,000 SF
Design
$50,000,000 est. value
Danville, KY 40422

College of Design
Renovation - 1,445,000 SF
Design
$38,600,000 est. value
Lexington, KY 40508

Softball Soccer Indoor Training Facility
New Construction - 11,000 SF
Bidding
$3,000,000 est. value
Bowling Green, KY 42101

Nursing Steam Vault Renovation
Renovation
Bidding
$600,000 est. value
Lexington, KY 40508

University of Louisville- General Contractor Services
Term Contract
Post-Bid
Louisville, KY 40292

Trager Center
Renovation
Post-Bid
Louisville, KY 40208

CEB 151 Elevated Control Room
Renovation
Results
$40,000 to $50,000 est. value
Lexington, KY 40503

Newtown Science Building Classroom Fit Up
Build-Out - 4,000 SF
Results
$472,548 est. value
Lexington, KY

Technical/Trade School
New Construction
Pending Verification
Alexandria, KY

Speed School of Engineering Addition
Addition
Conception
$75,000,000 est. value
Louisville, KY 40292

New College of Medicine
New Construction - 380,000 SF
Design
$380,000,000 est. value
Lexington, KY 40506

Clay Hall Front Entrance Resurfacing
New Construction
Post-Bid
Richmond, KY 40475

Research Building #2 Phase 4 Design Release 1 - Fit-Out
New Construction, Build-Out - 40,400 SF
Results
$15,517,519 est. value
Lexington, KY

Reported 07/21/2022 09:57 AM
Project Title

Install Additional Chiller Heating and Cooling Plant - Murray State University

Physical Address View project details and contacts
City, State (County) Murray, KY 42071   (Calloway County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025,
Bids Due View project details and contacts
Estimated Value $1,717,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install Additional Chiller Heating and Cooling Plant. A detailed scope has not yet been determined. This project is included in the city's 2022-2028 Capital Improvement Plan (CIP). As of July 20, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents