Similar Projects
Last Updated | 07/11/2022 01:21 AM |
Project Title | 2022 Hart Ditch Stabilization through Munster |
Physical Address | View project details and contacts |
City, State (County) | Crown Point, IN (Lake County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $350,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This work shall consist of removing excess/overgrown vegetation, accumulations of logs, woody debris, root wads, large branches, trees, tree stumps, fallen trees, trees in danger of falling into the stream or obstructing the flow, and other debris/trash along the bank within the limits of the project to prepare for construction activities. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |