Similar Projects
Last Updated | 03/07/2023 09:15 AM |
Project Title | Murphy USA #8610 / Fort Worth |
Physical Address | View project details and contacts |
City, State (County) | Fort Worth, TX 76133 (Tarrant County) |
Category(s) | Commercial, Heavy and Highway |
Sub-Category(s) | Gas Station, Retail, Site Development, Vehicle Sales/Service |
Contracting Method | Bids by Invitation |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,500,000 [brand] Estimate |
Plans Available from | Owner |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Plans call for a gas station/convenience store. The project site is located on Alta Mesa & Hulen Drive. As of March 7, 2023, a general contractor award has been announced. Direct all bids/inquiries to the bidding general contractors. The owner requests no email or phone inquiries. Question On the bid form under site specifics #4 include cost for all rock removal and disposal below 717' and under materials unit pricing rock removal and disposal above elevation 717' per CY'. The Geo Report shows the rock elevations in the boring logs, but we cannot find where on the plans or in the report where elevation 717' is. The grading plan shows existing elevations around 825 +/-. Clarify Answer Apologies for another bid form oversight. This was a carryover from the #8624 project. This elevation should be 837', which is 2 feet below the highest current elevation and is in accordance with the Geotech report. The bid form has been updated with the other corrections and will be posted after the pre-bid call today. By: Drew Boshears at 16-Feb-2023 08:29 AM CST Addendum #1 has been issued, which clarifies the bid time will be 2-28-2023, 3:30 PM CST. Memo Please review all bid addendum documents and include the rev-1 bid form as an attachment to your bid in Projectmates. Submitted By Drew Boshears Addendum #2 issued 2-28-2023 Apologies for the last-minute correction, but there was small error on unit cost for line 111, Rock Removal. The correct elevation should be 837' which matches this site-specific cost on line 71. Please use the updated bid form rev-2. Also, note that a cost should not be added for the Frac Tanks or Ground Water Treatment System. This will be treated as a change order at a cost-plus rate. Your bid will not be disqualified for submitting rev-1, given the last-minute notice on this addendum. Drew Boshears |
||||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 2,433 SF.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |