Similar Projects
Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range Phase II
Bidding
Salt Lake City, UT 84128

The Inn Between Cement Walkway
Post-Bid
Salt Lake City, UT 84105

Park Building Basement Structural Repairs
Post-Bid
Less than $500,000 est. value
Salt Lake City, UT 84112

Cast-In-Place Concrete Wall Repair
Results
$1,000,000 to $1,500,000 est. value
Kaysville, UT

Copper Hills Elementary School, Remove and Replace Concrete
Results
$20,000 to $30,000 est. value
Magna, UT 84044

Decant Station for Centerville City
Post-Bid
$450,000 est. value
Centerville, UT 84014

Small Concrete Projects
Results
Less than $8,563 est. value
Bluffdale, UT 84065

Jordan Willows Relining
Post-Bid
Lehi, UT 84043

Class 4000 and 5000 Concrete
Term Contract
Results
Less than $40,000 est. value
West Jordan, UT 84088

Concrete Work
Term Contract
Post-Bid

Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range
Results
Salt Lake City, UT

Installation, Upgrade, or Repair of Concrete Services- Stage 1
Term Contract
Post-Bid

Grit Chamber Concrete Walls
Results
Less than $50,000 est. value
Syracuse, UT 84075

Concrete Ready Mix - 2020
Post-Bid
Granite, Sandy, UT 84070

Sand Flats Shade Structure Concrete Footers
Results
Moab, UT 84532

Last Updated 06/30/2020 12:16 PM
Project Title

Headworks Biofilter Structure

Physical Address View project details and contacts
City, State (County) Syracuse, UT 84075   (Davis County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The District is adding a biofilter to remove both H2S and odors from its headworks building and its wet well chambers. The District is desirous of entering into an Agreement with a concrete contractor for the construction of the headworks biofilter structure. This project is to include the supply, placement, and tying of rebar curtains and matts, matt clearance supports, curtain spacers, and form clearance spacers, any epoxying rebar into concrete, forming, all supporting and bracing of forms, framing around the inlet supply sleeve, and placement of the concrete, concrete pumping, and any chemical curing additives required due to outside temperature at time of pouring. Concrete shall have a minimum 28 day compression strength of 4000 psi, rebar shall have a minimum yield strength of 11,780 lbs/sq inch, and splicing shall have a length of 15”, all embedments shall be 6” deep as per Hilti specification table for rebar in concrete, epoxied with Hilti HIT-RE 500 V3.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents