Similar Projects
Athens Street Improvements - City of Gainesville
Infrastructure, Alteration
Conception
$250,000 est. value
Gainesville, GA 30501

Mulberry Street Residential Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Flowery Branch, GA 30542

Sanitary Sewer Ream and Reline (8" DIP)
Infrastructure
Design
$200,000 CJ est. value
Flowery Branch, GA 30542

Sanitary Sewer Ream and Reline (8" DIP)
Infrastructure
Design
$200,000 CJ est. value
Flowery Branch, GA 30542

Candlewood Suites / Oakwood
New Construction, Infrastructure - 56,056 SF
Bidding
$10,000,000 CJ est. value
Oakwood, GA 30566

AutoZone #0914 / Gainesville
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Gainesville, GA 30501

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Large Water Meter Replacement
Results
Flowery Branch, GA

Wauka Mountain Elementary School - Site Improvements
Results
Gainesville, GA 30506

Agile Cold Storage Freezer Distribution Hub
New Construction, Infrastructure - 150,000 SF
Pending Verification
$20,000,000 CJ est. value
Gainesville, GA 30507

Moss Farm
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Lula, GA 30554

Mitchell Street Improvements - City of Flowery Branch
Infrastructure
Conception
$851,126 CJ est. value
Flowery Branch, GA 30542

SR 53 Fm CS 656 / Cedar Ridge Dr to S of SR 211 / Tanner Mill Rd
Infrastructure
Design
$2,000,000 CJ est. value
Gainesville, GA 30501

RFP Construction Manager at Risk - Lyman Hall Elementary - Additions and Renovations 2022
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$26,000,000 CJ est. value
Gainesville, GA 30504

Agriculture Meter Installation
Infrastructure
Results

Last Updated 10/07/2022 08:43 AM
Project Title

FY 2023 Water Main Improvements Project

Physical Address View project details and contacts
City, State (County) Gainesville, GA 30501   (Hall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Design Development, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Gainesville is requesting individual sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the FY 2023 Water Main Improvements project. The project includes the following: Furnishing all products and performing all labor necessary for the construction of approximately 11,700 LF of 12-inch DIP water main, 2,710 LF of 12-inch DIP Restrained Joint Pipe, 23 fire hydrants, 35 valves, 155 LF of various 12-inch jack & bores with 18-inch steel castings, 45 LF of various 12-inch open cuts and, including all other necessary and required appurtenances and erosion and sedimentation control. Pre-qualification of Bidders is required for the FY 2023 Water Main Improvements project. All applicants will be notified of their status by Thursday, October 20, 2022 Bids are to be submitted to the DWR on a date to be released after pre-qualification.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents