Similar Projects
22nd Street - I-10 To Tucson Boulevard - SR5A - City Of Tucson
Infrastructure
Conception
$117,652,200 CJ est. value
Tucson, AZ 85711

Corona De Tucson Interconnect Transmission Main - W931 - City of Tucson
Infrastructure
Conception
$8,580,000 CJ est. value
Tucson, AZ 85701

South Church Hotel
Renovation - 94,000 SF
Design
$38,000,000 est. value
Tucson, AZ 85701

AutoZone #3618 / Tucson (Ajo)
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Tucson, AZ 85757

Tucson - Benson Highway (I-10) (Ajo Way to MP 272)
Infrastructure
Bidding
$27,461,166 CJ est. value
Tucson, AZ 85706

Casa Grande - Tucson Highway (I-10) (Ina Road to Ruthrauff Road)
Infrastructure
Bidding
$200,000,000 CJ est. value
Tucson, AZ 85706

Casa Grande - Tucson Highway (I-10) (I-10; Wymola to Ina Rd)
Infrastructure
Sub-Bidding
$6,305,000 CJ est. value
Tucson, AZ 85706

Site Preparation for AMARG Tension Fabric Structures
Post-Bid
Tucson, AZ 85707

Granada Avenue Hotel Conversion
New Construction, Renovation
Post-Bid
Tucson, AZ 85701

Pinal Airpark Airfield Improvements - Phase I
Infrastructure
Results
$8,904,710 CJ est. value
Marana, AZ 85653

Arizona Inn (formerly referred to as "Hotel Arizona")
Renovation
Construction
Tucson, AZ 85719

TOKA 12 Lot Subdivision - San Xavier District
New Construction
Construction
$1,271,309 est. value
Tucson, AZ 85746

22nd Street Manufacturing and Warehouse Building
New Construction, Infrastructure - 16,100 SF
Pending Verification
$2,000,000 CJ est. value
Tucson, AZ 85713

River Road Townhome Development
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Tucson, AZ 85704

Houghton Road Self Storage
New Construction, Infrastructure - 87,523 SF
Design
$20,000,000 CJ est. value
Tucson, AZ 85747

Last Updated 08/22/2022 12:31 AM
Project Title

RFQ Construction Manager at Risk - Downtown Campus Hotel Properties Development

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85701   (Pima County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $14,583,865 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pima Community College is requesting Statements of Qualifications to provide Construction Manager at Risk Services to include design phase assistance and complete construction services for the Project: Downtown Campus Hotel Properties Development Project: Downtown Campus Hotel Properties Development: Tucson Inn, Copper Cactus Inn and Frontier Motel located in the Miracle Mile Historic District, Drachman St., Tucson, AZ 85705. QUESTIONS IN WRITING TO: Jennifer Moore, MBA, CPPB, Senior Procurement Analyst via email at do-bids-proposals@pima.edu by March 22, 2022 at 5:00 PM (MST) The Project Budget allocation range is $8.3 to $14.5 million. This range represents the total amount available for project development including: new construction, site work, utilities, furniture and equipment and fees. The Construction Budget range the architect shall use for planning the facilities is $6.5 to $10.5 million. This final budget shall not be changed, except by a written notice from the Assistant Vice Chancellor of Facilities to the architect.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents