Similar Projects
Slurry Seal
Bidding
Lehi, UT

Continuous Micro Surface Seal Type III - 2021
Bidding
$1 to $900,000 est. value
Spanish Fork, UT

Construction of the 2020 Provo City Streets Micro-Surfacing Project
Post-Bid
Provo, UT

Construction of the 2020 Provo City Streets Crack Seal Project
Post-Bid
Provo, UT

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

US-89; 1200 N Mapleton to 700 S Springville Preservation High Volume
Results
$500,000 to $1,500,000 est. value
UT

Type II Slurry Seal - 2021
Bidding
Less than $175,000 est. value
Spanish Fork, UT

Payson City 400 North Road Improvements from 600 West to 1100 West
Post-Bid
$245,000 est. value
Payson, UT 84651

SR-68; MP 11 to MP 14.6 Rehabilitation High Volume
Results
$500,000 to $1,500,000 est. value
UT

2021 Roadway Project
Bidding
$2,400,000 to $2,800,000 est. value
Orem, UT

Construction of the 2020 Provo City Streets Rehabilitation Project
Post-Bid
Provo, UT 84606

SR-92; AF Canyon and SR-144 Rehabilitation High Volume
Results
UT

US-89; Improve Mobility/Safety in Orem City Limits
Post-Bid
$1,500,000 to $3,000,000 est. value
Orem, UT 84057

Center Street Widening
Results
Spanish Fork, UT 84660

2020 Eagle Mountain Slurry Seal Project
Post-Bid
Eagle Mountain, UT 84005

Last Updated 08/13/2020 01:22 PM
Project Title

2020 Seal Coat Project

Physical Address View project details and contacts
City, State (County) Orem, UT 84057   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals from qualified and licensed Seal Coat Contractors for the application of a seal coat at various city owned parking areas. The parking lot areas include approximately 17,000 square feet at Fire Station #2 (900 North Main Street), approximately 38,000 square feet at Fire Station #3 (255 North 1200 West), approximately 11,000 square feet at Bonneville Park (800 West 1450 North), approximately 69,000 square feet at the South Cemetery (1200 North 800 East), and approximately 205,000 square feet at the City Center (Center Street and State Street). See the attached Construction Drawings and area maps for locations of each parking area in Orem City. The total project area is approximately 340,000 square feet.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents